My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3105 PINE ST DELTA HOTEL 2020-05-04
>
Address Records
>
PINE ST
>
3105
>
DELTA HOTEL
>
3105 PINE ST DELTA HOTEL 2020-05-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 11:37:07 AM
Creation date
5/4/2020 11:28:11 AM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
3105
Tenant Name
DELTA HOTEL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Management Questionnaire For <br /> Single FamilyResidential / Duplex / Small Projects <br /> Step 1: Fill in the Quantities below: <br /> The total amount of proposed hard surfaces(rooftop,pavement, etc.)for my project site is: 16,329 S.F. (Box 1) <br /> E16 638 <br /> The amount of existing hard surfaces on my project site that will be removed or replaced is: S.F. (Box 2) <br /> The amount of net new hard surfaces on my site(proposed minus existing to be removed/replaced)is: -309 S.F. (Box 3) <br /> Step 2: Evaluate the three statements below by selecting TRUE or FALSE: <br /> The value of Box 2+Box 3=Box 1, above. <br /> ANSWER: TRUE Reserved for City of Everett Public Works Approval Stamp <br /> *If False,re-evaluate your areas and try again. <br /> APPROVED <br /> 2. The value in Box 1 above is 2,000 square feet or more. PURL.{. ORKS 0 'AR ENT <br /> ANSWER: TRUE I i <br /> If False,only complete General Information&Construction Stormwater Plan. By <br /> DATE g <br /> 3. The value in Box 3 above is less than 5,000 square feet. CITY OF EVERETT REVIEWED FOR PERMIT <br /> ANSWER: TRUE -050,�j,{/� / 5Z <br /> *If False,submit an Engineered Drainage Report addressing MR#1-9. " <br /> Step 3: Proceed with this entire Questionnaire if all 3 answers above are TRUE. <br /> General Information: <br /> Project Site Address: 3105 Pine Street, Everett,WA <br /> Prepared By: Chris Park, PE (KPFF Consulting Engineers) <br /> Date Prepared: 1/26/18 <br /> Existing Site Information: <br /> 1. Please describe the existing structures,hard surfaces,slopes,drainage patterns,drainage <br /> pipes,vegetation,etc. <br /> The site is approximately 161,008 sf and is currently occupied by the Everett Holiday Inn <br /> (^'42,055 sf surface area) located within the center of the site. A circular parking lot <br /> surrounds the structure. The topography of the site is a gentle slope from the northwest <br /> property corner toward the southeast,with a total grade drop of approximately 12 feet over <br /> 750 feet(^'1.6%). Drainage structures, located in the middle of the parking lot drive aisles <br /> convey runoff toward the west to the combined sewer within Pine Street. <br /> 2. Please provide the following quantities of existing hard surfaces in square feet: <br /> Existing Roof Area:42,055 sf <br /> Existing Other Hard Surfaces(pavement,gravel,etc.): 89,900 sf <br /> 3. Which direction does the site currently slope?(Towards a street,towards an alley, <br /> towards a neighboring property,etc.)The topography of the site is a gentle slope from the <br /> Cage1of7 <br /> CITY` Of= LVIILIRETIT POOCedar St:cet i f .;., , ,A';^982:1 425 257 S8n everett o nov <br />
The URL can be used to link to this page
Your browser does not support the video tag.