My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5002 BEAUMONT DR 2020-05-04
>
Address Records
>
BEAUMONT DR
>
5002
>
5002 BEAUMONT DR 2020-05-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 2:16:03 PM
Creation date
5/4/2020 2:15:12 PM
Metadata
Fields
Template:
Address Document
Street Name
BEAUMONT DR
Street Number
5002
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC *ORKS PERMIT =ate Applied: 11/27/2017 <br /> City of Everett Public Works Department Public Works Permit#: PW1711-032 <br /> 3200 Cedar Stree <br /> Parent Permit#: C1711-007 <br /> t <br /> Everett,WA 98201 Planning Reference#: <br /> ,' " j (425) 257-8810 Public Works Fee: $140.00 <br /> 12 PEAR 2018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> D & G HOPKINS LLC GLACIER VIEW PROPERTIES <br /> 13220 47TH AVE SE 10121 EVERGREEN WY STE 25-165 <br /> MILL CREEK, WA, 98012 EVERETT,` WA, 98204 <br /> PHONE: PHONE: c500 2-- <br /> TAX PARCEL ID#: 00377500000500 SITE ADDRESS:-50 eL1i-Y-A <br /> DESCRIPTION: SITE WORK FOR NEW SFR <br /> THIS PERMIT TO BE POSTD • ' JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: C <br /> 1. All calls for inspection shall be made 24 hou's in adv.. ce. <br /> 2. All work shall be performed in accordanc- ith the f•1 1,1 and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. / \ <br /> 3. Call Location Underground Service 48/ our. .-fo\7 you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans 1ppro :. ..y t je City of Everett Public Works Department dated 2/22/2018. <br /> Approved plans must remain on job-si -1atall ti J <br /> 5. Contact the City of Everett Public orks Inspe dor Randy Allen at 425-339-7403 prior to starting construction for a <br /> consultation, to evaluate Erosion/S dimentation co trol set-up, and with all other inspection requests. <br /> 6. Install and maintain erosion co, trot measures per City of Everett Standards and per the direction of the PW Inspector. <br /> Remove upon completion of the .roject prior to final approval of the permit. <br /> 7. Street restoration must be dee per COE Standard Drawing#326 and trench restoration per#614, or as directed by the <br /> City PW Inspector. Permane/ restoration must be completed within 2 weeks of completion of utility work. <br /> 8. Keep City streets clean all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 9. Protect all existing underground utilities during construction. <br /> 10. All work constructed within the public right-of-way must be removed or relocated at the owner's expenseif the City ever <br /> requires use of the right-of-way for municipal purposes. <br /> Public Works Permit Fee Breakdown: y <br /> Driveway $25.00 F <br /> Erosion Control $50.00 <br /> Misc. Minor(site/drainage work) $25.00 MAR 1 2 2013 U <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 CITY OF EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> �,, /�, c �(� �,, p harmless the City of Everett from any and all claims for damages,costs, <br /> .J,, a �v[ ,, ZZ(��O expenses,or causes of action that may arise because of installation and <br /> aintenance o •- improvement or other right-of-way use here to applied <br /> Approved for Construction (P lic Works) Date for an. fu -r agr:-s to remove same upon notice from the City and to <br /> replac• . r is prop rty damaged thereby. 9 <br /> 01 v . <br /> FINAL INSPECTION Date ` -021*--- 3 <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY flti <br />
The URL can be used to link to this page
Your browser does not support the video tag.