Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 11/27/2017 <br /> City of Everett Public Works Department Public Works Permit#: PW1711-032 <br /> 0.1N. <br /> 3200 Cedar Street Parent Permit#: <br /> h' Everett,WA 98201 Planning Reference#: ji <br /> (425)257-8810 Public Works Fee: $0 <br /> -4414 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> GLACIER VIEW PROPERTIES LLC GLACIER VIEW PROPERTIES <br /> 6101 200TH ST SW SUITE 205 10121 EVERGREEN WY STE 25-165 <br /> LYNNWOOD, WA, 98036 EVERETT, WA, 98204 <br /> PHONE: PHONE: <br /> TAX PARCEL ID#: 00377500000500 SITE ADDRESS. <br /> DESCRIPTION: SITE WORK FOR NEW SFR .5402- Zeta APPO / , <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 2/22/2018. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for a <br /> consultation, to evaluate Erosion/Sedimentation control set-up, and with all other inspection requests. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector. <br /> Remove upon completion of the project prior to final approval of the permit. <br /> 7. Street restoration must be done per COE Standard Drawing#326 and trench restoration per#614, or as directed by the <br /> City PW Inspector. Permanent restoration must be completed within 2 weeks of completion of utility work. <br /> 8. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 9. Protect all existing underground utilities during construction. <br /> 10. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever <br /> requires use of the right-of-way for municipal purposes. <br /> Public Works Permit Fee Breakdown: <br /> Driveway $25.00 <br /> Erosion Control $50.00 <br /> Misc. Minor(site/drainage work) $25.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> City of Everett Oficial Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> ( $C( 7 //Z/fig C:t P -6 O(4.141Et 3 , )Mt <br />