Laserfiche WebLink
A V <br /> 8. Exterior walls along the north and south sides of the building are required to be 1-hour protected <br /> from exposure on both sides of the wall per IBC 705.5.Assuming the existing building to the south <br /> is to remain unsprinklered, this same requirement applies to the north wall of the existing building. <br /> 9. Eaves and any other combustible projections along the north and south walls are required to be <br /> protected in accordance with IBC 705.2. Vent openings are prohibited in these locations by IBC <br /> 705.8. <br /> 10. Cross sections indicate 36"high guard rails. IBC 1015 requires them to be 42"high. At stairways, a <br /> 42"guardrail and a 34"-38"handrail are both required. <br /> 11. All handrails are required to have extensions complying with IBC 1014.6. <br /> 12. The method of compliance with RCW 64.55 must be submitted prior to the issuance of the building <br /> permit. <br /> 13. IBC 1107.7.1.1 requires both ground floor units to be"Type B"and fully comply with all of the <br /> requirements of ANSI A117.1.,chapter 10. Please provide all door sizes, maneuverability spaces, <br /> grab bar blocking , etc. <br /> 14. The stairways and exit passageway floor are required to be designed to support a live load of 100 <br /> psf. This should also be added into the structural notes. <br /> 15. The structural notes should be corrected to indicate a wind speed of 110 mph. <br /> 16. The structural notes should include specifications for structural steel. <br /> 17. All beam sizes must be identified. <br /> 18. Holdowns and column bases should be detailed for application at the floor level at <br /> which they are intended. <br /> 19. The w10x22 garage door header must be analyzed,designed and detailed to support the <br /> overturning forces imposed by the shear walls that it supports. <br /> 20. The interior shear walls do not appear to line up vertically and holdowns are missing. <br /> 21. A"statement of special inspections"must be included in the structural notes in accordance with <br /> IBC 1704.3. <br /> I will be retired from the city by the time you get this. Meg Haley 425-257-8813 will be your contact for <br /> architectural questions. James Brander 425-257-7287 is the contact for structural. <br /> Please provide a corrections letter stating how each of the above items is addressed along with applicable <br /> page numbers. <br /> Upon submittal of the drawings,your application will be given priority and plan reviews will recommence. <br /> All required submittals shall be sufficient detail and contain sufficient information to ensure that the <br /> proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> Steve Miller <br /> Associate Engineer <br /> )\ <br />