• <br /> Horizon Elementary School — Classroom Portable Installation <br /> NI II Construction SWPPP Narrative <br /> May 10, 2019 <br /> engineering p e <br /> origination point within this designated on-site wetland area. Along the eastern property boundary <br /> there is a steep slope with a rockery at the base of the slope located on the adjacent multifamily <br /> residential property. <br /> 6. SOILS <br /> According to USDA Natural Resources Conservation Service Web Soil Survey,the site consists <br /> of Alderwood-Urban land complex, 2 to 8 percent slopes. Hydrologically,this soil type is <br /> typically considered moderately well drained yielding suitable infiltration rates. The site is <br /> located in the Merrill &Ring Creek drainage basin,which ultimately discharges into Port <br /> Gardner Bay in the Puget Sound. <br /> 7.POTENTIAL EROSION PROBLEM AREAS <br /> The site is not within an erosion hazard or channel migration area, so there are not expected to be <br /> any significant erosion problems. Per the proposed contract documents,the contractor is to <br /> provide protection for soils to limit the exposure to erosion. The limitation of disturbance, <br /> adequate cover practices, seasonal work limitation, and runoff control are the most effective <br /> methods for reduction of turbidity in stormwater runoff. Any runoff that does occur will be <br /> directed to the existing storm facilities with installed inlet protection which then discharges to the <br /> existing detention pond. Areas that have not been permanently stabilized will be addressed using <br /> DOE-approved BMPs,per the construction documents. <br /> 8.CONSTRUCTION PHASING <br /> At this time, it is not expected that the project will be formally phased. The contractor is <br /> responsible for coordinating work of all subcontractors to keep the duration of site disturbance <br /> limited to the maximum extent possible. <br /> 9.CONSTRUCTION SCHEDULE <br /> Construction is expected to begin in July 2019 and be completed by September 2019. <br /> Construction is not expected to take place in the wet season, October 1st to April 30th. Should any <br /> wet weather conditions occur during construction,the contractor shall implement the de-watering <br /> procedures outlined in this SWPPP and applicable BMPs including,but not limited to C123, <br /> Plastic Covering; C121, Mulching; C122,Nets and Blankets; C126,Polyacrylamide for Soil <br /> Erosion Protection; C130, Surface Roughening. <br /> I 0.FINANCIAL/OWNERSHIP RESPONSIBILITIES <br /> This property is owned by Mukilteo School District. The accepted low bidder on the project will <br /> be responsible for posting a performance and payment bond with Everett School District, and <br /> thus will be the responsible party for any liability associated with erosion and sedimentation <br /> impact. <br /> I I.ENGINEERING CALCULATIONS <br /> A copy of any calculations performed during design of the project and relevant storm drainage <br /> modeling discussions is included in the project's Stormwater Drainage Report. <br /> Page 4 <br />