Laserfiche WebLink
11/14/2019 Page 2 <br /> City of Everett <br /> 8:27:00AM . <br /> .0"7INSPECTION ACTIVITY REPORT <br /> 10/30/2019 10/30/2019 MECH 06-FINAL SDP APPROVAL Craig:425-238-3266 <br /> (10/30/2019 1:37 PM SDP) <br /> Ok as noted:primer and glue the pipe and <br /> fittings. <br /> 11/1/2019 11/1/2019 BLDG 15-FINAL DWF NOT READY Garret:425-238-3266 <br /> (11/1/2019 8:48 AM DWF) <br /> Need Electrical and Gas final before <br /> Building Final inspection. <br /> 11/5/2019 11/5/2019 GAS 03-FINAL SDP APPROVAL Craig:425-238-3266 <br /> 11/6/2019 11/6/2019 BLDG 15-FINAL DWF CORRECTION 425-238-3266 CRAIG WEST <br /> (11/6/2019 9:58 AM DWF) <br /> Main floor bathroom window/double hung <br /> -needs to be safety/tempered glass. <br /> 4 or more steps require hand-railing from <br /> basement. <br /> Landing at bottom of stairway off patio <br /> deck needs to extend 36"from bottom step <br /> noising and width of stairway. <br /> 11/13/2019 11/13/2019 BLDG 15-FINAL DWF APPRVD-PERK Craig:425-238-3266 <br /> 11/13/2019 11/13/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> INSP12 ani/$ YSTEMS <br />