Laserfiche WebLink
Roof downspouts at each corner of the portable buildings will discharge to the gravel infiltration <br />facility. <br />PROPOSED PROJECT LIMITS LAND COVER <br />Gravel Infiltration Bed: 2,817 square feet <br />Roof 1,774 square feet (over top infiltration bed) <br />Asphalt Path: 437 square feet <br />Total Area: 3,254 square feet <br />PROPOSED RUNOFF <br />Proposed flow frequency rates from WWHM 2012 (Appendix B): <br />2 year 0 cfs <br />10 year 0 cfs <br />50 year 0 cfs <br />100 year 0 cfs <br />MINIMUM REQUIREMENT #2: SWPPP <br />A Stormwater Management Plan, including Temporary Erosion and Sedimentation Control <br />BMPs, is included in Appendix A. Stormwater Pollution Prevention Plan elements are described <br />below. <br />Element #1: Preserve Vegetation/Mark Clearing Limits <br />The project site is surrounded by lawn. Only lawn within the construction foot print will be <br />removed. Limits of construction will be marked with silt fence or straw on the downslope side <br />and by surveyor's tape, cones, paint or temporary fencing, or other methods on the upslope side. <br />Element #2: Establish Construction Access <br />Access to the site will be through lawn from an asphalt parking lot. Due to the small area of <br />disturbed soils, there is not room to install a gravel construction entrance within the disturbed site <br />area. Due to the low square footage of the disturbed site, construction equipment will operate <br />from the lawn area and traverse the lawn to enter and exit the site. <br />Element #3: Control Flow Rates <br />Stormwater from this project will be infiltrated. Gravel building pads will be placed at the <br />beginning of construction and will serve as infiltration facilities during and after construction. <br />No temporary facilities are proposed. <br />Element #4: Install Sediment Controls <br />Silt fence will be installed on the downslope side of the project before the existing lawn is <br />removed for the gravel building pads. The disturbed site will be stabilized by the gravel building <br />pads within a few days of lawn removal. <br />Stormwater Site Plan, Including SWPPP 5 <br />Silver Lake Elementary School Portables <br />