Laserfiche WebLink
Element #S: Stabilize Soils <br />Disturbed soils where lawn is removed will be stabilized by the gravel building pads within days <br />of lawn removal. <br />Element #6: Protect Slopes <br />Steep slopes are not present on the project site. <br />Element #7. Protect Drain Inlets <br />There are no existing or proposed drain inlets at the project site. <br />Element #8: Stabilize Channels and Outlets <br />There are no existing or proposed channels or outlets at the project site. <br />Element #9: Control Pollutants <br />Lawn and topsoil removed from the site will be disposed of properly off site. Materials used on <br />the job site will be properly stored and contained, and concrete will be handled according to the <br />guidelines in the Stormwater Manual. <br />Element #10: Control De -Watering <br />No dewatering is required for this project. <br />Element #11: Maintain BMPs <br />Temporary and permanent erosion and sediment control BMPs shall be maintained and repaired <br />as needed to ensure continued performance of their intended function. <br />Element #12: Manage the Project <br />Temporary and permanent erosion and sediment control BMPs shall be maintained and repaired <br />as needed to ensure continued performance of their intended function. Since the project area is <br />less than one acre, a Certified Erosion and Sediment Control Lead is not required. <br />Element #13: Protect Low Impact Development BMPs <br />The infiltration facility will be protected by not disturbing soil outside the limits of construction. <br />Stormwater Site Plan, Including SWPPP 6 - LI <br />Silver Lake Elementary School Portables <br />