My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12815 19TH AVE SE 2022-05-06
>
Address Records
>
19TH AVE SE
>
12815
>
12815 19TH AVE SE 2022-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2022 1:24:04 PM
Creation date
5/6/2020 8:11:17 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINIMUM REQUIREMENT #3: POLLUTION SOURCE <br />CONTROL <br />Pollution Source Control BMPs will be implemented during construction to prevent pollution. <br />Proposed BMPs will be based on the requirements of the Stormwater Manual and will include <br />but are not limited to the following: <br />BMP C101, Preserving Natural Vegetation <br />BMP C233, Silt Fence <br />MINIMUM REQUIREMENT #4: PRESERVATION OF NATURAL <br />DRAINAGE <br />The project site is currently lawn that slopes north to an existing bioswale. Roof drainage from <br />the proposed portables will be infiltrated. The existing bioswale will not be disturbed. <br />MINIMUM REQUIREMENT #5: ON -SITE STORMWATER <br />MANAGEMENT <br />This project is a redevelopment project that adds 2,211 square feet of hard surfaces. <br />This project will comply with the LID performance standard by infiltrating stormwater. <br />Calculations demonstrating compliance with the LID performance standard are included in <br />Appendix B. <br />sah\21\17\020\reports\silver lake elem storm site plan report\stormwater site plan report.docx\jdj <br />Stormwater Site Plan, Including SWPPP 7 • , , - <br />Silver Lake Elementary School Portables <br />
The URL can be used to link to this page
Your browser does not support the video tag.