My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12815 19TH AVE SE Geotech Report 2022-10-25
>
Address Records
>
19TH AVE SE
>
12815
>
Geotech Report
>
12815 19TH AVE SE Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:21:32 PM
Creation date
5/6/2020 8:21:51 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12815
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Silver Lake Elementary School Subsurface Exploration, Geologic Hazard, <br /> Building Additions, Service Drive, and Water Line Installation and Geotechnical Engineering Report <br /> Everett, Washington Design Recommendations <br /> gradation and variable thickness, and should therefore not be considered part of the required <br /> pavement section. If the existing 518-inch minus crushed rock can be removed without <br /> significant fines contamination, the material can be reused as the upper leveling course in the <br /> ratio described above (1 inch of 114-inch:11/2 inches of 5/8-inch crushed rock). <br /> 16.0 PROJECT DESIGN AND CONSTRUCTION MONITORING <br /> At the time of this report, site grading and construction methods had not been finalized. We <br /> are available to provide additional geotechnical consultation as the project design develops and <br /> possibly changes from that upon which this report is based. We recommend that AESI <br /> perform a geotechnical review of the plans prior to final design completion. In this way, our <br /> earthwork and foundation recommendations may be properly interpreted and implemented in <br /> the design. <br /> We are also available to provide geotechnical engineering and monitoring services during <br /> construction. The integrity of the pavement section depends on proper site preparation and <br /> construction procedures. In addition, engineering decisions may have to be made in the field <br /> in the event that variations in subsurface conditions become apparent. Construction monitoring <br /> services are not part of this current scope of work. If these services are desired, please let us <br /> know, and we will prepare a cost proposal. <br /> We have enjoyed working with you on this study and are confident that these recommendations <br /> will aid in the successful completion of your project. If you should have any questions or <br /> require further assistance, please do not hesitate to call. <br /> Sincerely, M[. <br /> ASSOCIATED EARTH SCIENCES, INC. y� <br /> Kirkland, Washington �`�At, wA. '1 b,, <br /> 0 x7,:: .. Al* <br /> 1 <br /> 04, _6_23580 <br /> • I <br /> 41/ONAL St4° <br /> %24/"P- dt/..J17514,aux11. I EXPIRES 11/20/j` <br /> Susan G. Beckham, P.E. Kurt D. Merriman, P.E. <br /> Senior Project Engineer Principal Engineer <br /> Attachments: Figure 1: Vicinity Map <br /> Figure 2: Site and Exploration Plan <br /> Appendix: Exploration Logs <br /> November 8, 2006 ASSOCIATED EARTH SCIENCES,INC. <br /> SGB/!d-KE02599B2-Projeas120020599IKEIWP Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.