My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
222 W CASINO RD Geotech Report 2022-10-25
>
Address Records
>
W CASINO RD
>
222
>
Geotech Report
>
222 W CASINO RD Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:22:22 PM
Creation date
5/6/2020 8:25:07 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
222
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoTest Services, Inc. May 3, 2019 <br /> Mukilteo School District 19-0194 <br /> Stormwater Infiltration Potential <br /> Based on the presence of unsuitable fill soils and very dense, low permeable native soil to the full depths <br /> explored in all the in all the explorations, it is our opinion that the on-site infiltration of stormwater is not <br /> feasible for this project site. <br /> Geotechnical Consultation and Construction Monitoring <br /> GTS recommends that we be involved in the project design review process. The purpose of the review is <br /> to verify that the recommendations presented in this report are understood and incorporated in the <br /> design and specifications. <br /> We also recommend that geotechnical construction monitoring services be provided. These services <br /> should include observation by GTS personnel during structural fill placement, compaction activities and <br /> subgrade preparation operations to confirm that design subgrade conditions are obtained beneath the <br /> areas of improvement. <br /> Periodic field density testing should be performed to verify that the appropriate degree of compaction is <br /> obtained. The purpose of these services is to observe compliance with the design concepts,specifications, <br /> and recommendations of this report. In the event that subsurface conditions differ from those anticipated <br /> before the start of construction,GeoTest Services would be pleased to provide revised recommendations <br /> appropriate to the conditions revealed during construction. <br /> GeoTest is available to provide a full range of materials testing and special inspection during construction <br /> as required by the local building department and the International Building Code. This may include <br /> specific construction inspections on materials such as reinforced concrete, reinforced masonry, wood <br /> framing and structural steel. These services are supported by our fully accredited materials testing <br /> laboratory. <br /> USE OF THIS REPORT <br /> GeoTest Services has prepared this report for the exclusive use of the Mukilteo School District and their <br /> design consultants for specific application to the design of the proposed new portable building located at <br /> 222 W. Casino Road in Everett, Washington. Use of this report by others is at the user's sole risk. This <br /> report is not applicable to other site locations. Our services are conducted in accordance with accepted <br /> practices of the geotechnical engineering profession; no other warranty,express or implied, is made as to <br /> the professional advice included in this report. <br /> Our site explorations indicate subsurface conditions at the dates and locations indicated. It is not <br /> warranted that these conditions are representative of conditions at other locations and times. The <br /> analyses, conclusions, and recommendations contained in this report are based on site conditions to the <br /> limited depth and time of our explorations, a geological reconnaissance of the area, and a review of <br /> previously published USGS geological information for the site. If variations in subsurface conditions are <br /> encountered during construction that differs from those contained within this report, GeoTest should be <br /> allowed to review the recommendations and, if necessary, make revisions. If there is a substantial lapse <br /> of time between submission of this report and the start of construction, or if conditions change due to <br /> construction operations at or adjacent to the project site,we recommend that we review this report to <br /> determine the applicability of the conclusions and recommendations contained herein. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.