Laserfiche WebLink
GeoTest Services, Inc. May 3, 2019 <br /> Mukilteo School District 19-0194 <br /> The earthwork contractor is responsible to perform all work in conformance with all applicable <br /> WISHA/OSHA regulations. GeoTest Services, Inc. is not responsible for job site safety on this project,and <br /> this responsibility is specifically disclaimed. <br /> Attachments: Figure 1 Vicinity Map <br /> Figure 2 Site and Exploration Plan <br /> Figure 3 Typical Footing and Wall Drain Section <br /> Figure 4 Typical Utility Trench <br /> Appendix A Field Exploration Logs <br /> Appendix B Grainsize Analysis <br /> Attachment Report Limitations and Guidelines for Its Use <br /> (3 pages) <br /> REFERENCES <br /> Minard, J.P. 1985. Geologic Map of the Everett 7.5-Minute Quadrangle, Snohomish County, <br /> Washington. United States Geological Survey. Map MF-1784. <br /> Washington Interactive Geologic Map. Washington State Department of Natural Resources - <br /> Online Web Services, 2019. <br /> 11 <br />