My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
30 112TH ST SE 2020-05-06
>
Address Records
>
112TH ST SE
>
30
>
30 112TH ST SE 2020-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 9:32:25 AM
Creation date
5/6/2020 9:30:18 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
30
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLICOIORKS PERMIT <br /> ate Applied: 2/5/2018 <br /> lill'Ai6,00,0,4 City of Everett Permit Services Public Works Permit#: PW1802-001 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: <br /> 1140/1 "4Everett,WA 98201 Planning Reference#: REVI18-005 <br /> (425)257-8810 Public Works Fee: $115.00 <br /> 09 u ' 2018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> 112TH LLC Don Shaffer <br /> PO BOX 232 3615 188TH ST NW <br /> NORTH LAKEWOOD, WA, 98259 STANWOOD, WA, 98292 <br /> PHONE: PHONE: 3606527745 <br /> TAX PARCEL ID#: 00573600004200 SITE ADDRESS: 30 112TH ST SE <br /> DESCRIPTION: SITE WORK FOR NEW SFR <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans and drainage report approved by the City of Everett Public Works Department dated <br /> 5/22/2018. Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 prior to starting construction for a <br /> consultation and to evaluate Erosion/Sedimentation control set-up. All inspections must be formally requested through one <br /> of our three inspection scheduling options. See attached handout for information. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities and environmentally sensitive areas during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new impervious surfaceswill be managed <br /> on-site in a manner that does not adversely affect neighboring properties, including the Cit 'sus • .r easements <br /> and the improvements located therein. <br /> 10. A Landscape Inspection is required bythe PlanningDepartmentprior to final byth Pat5lic�//orks Ins . Contact the <br /> P p <br /> Planning Department at 425-257-8731 to schedule the inspection with Grace Pollard. <br /> 11. This permit must be finaled in order to close out this permit/grant a Certificate of 0 u4y.sibBlIn- .47• ion line to <br /> request a Final for this permit when all items have been completed. <br /> ERETT <br /> Public Works Permit Fee Breakdown: CITY OF Permit Services Services <br /> Driveway $25.00 <br /> Erosion Control $50.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> City of Everett Oficial Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> ` �(N�v 1, l /3 /p� harmless the City of Everett from any and all claims for damages,costs, <br /> ID!// O expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date /Dig [i' 5 <br /> Approved as Constructed (PW Inspector) ignature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> FILE <br />
The URL can be used to link to this page
Your browser does not support the video tag.