My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
30 112TH ST SE 2020-05-06
>
Address Records
>
112TH ST SE
>
30
>
30 112TH ST SE 2020-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 9:32:25 AM
Creation date
5/6/2020 9:30:18 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
30
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS <br /> MEMORANDUM <br /> TO: Timothy Sarkela, E.I.T I Western Engineers & Surveyors, 425-356-2700 <br /> Jesse Jarrell, P.E. I Western Engineers & Surveyors, 425-356-2700 <br /> FROM: Sabrina Fandler, P.E. I City of Everett Engineering/Permit Services, 425-257-7813 <br /> DATE: 4/20/2018 <br /> SUBJECT: Plan Review Comments for Public Works Permit Application <br /> PROPOSAL: Site Work for Shaffer SFR <br /> LOCATION: 30 112th St SE <br /> PERMIT#: PW1802-001 <br /> A review of this project by the Engineering/Permit Services Division indicates that the following <br /> revisions should be made and/or the following conditions must be met: <br /> 1. Please see the compiled list of comments below and the attached redlines to revise your plans <br /> accordingly, prior to resubmitting to the Permit Services Counter. If you have any questions <br /> regarding the comments/redlines or need anything further, please directly contact this project's <br /> Public Works plans reviewer, Sabrina Fandler, at 425-257-7813 or SFandler@everettwa.gov, or <br /> the other reviewers listed depending on the scope of the question. Please note that these comments <br /> are compiled from Public Works reviewers for the Public Works (civil)plans only. The applicant <br /> team may receive a separate comment letter from the Building Department and/or the Planning <br /> Department for architectural or other types of drawings. <br /> a. Please resubmit the following items to the Permit Services Counter with your resubmittal <br /> once all requested revisions have been made: <br /> i. Transmittal Sheet: (1)available at the Permit Counter(and included herein for your <br /> use upon resubmittal). <br /> Plans: (2) sets of revised plans plus original City Markups. <br /> Drainage Report: (2)copies of revised drainage report plus original City Markups. <br /> SWPPP Report: (2) Copies of revised SWPPP report plus original City Markups. <br /> The Permit Counter is open Monday through Friday from 7:30am-12:OOpm and from <br /> 1:OOpm-4:OOpm (closed between 12:OOpm-1:OOpm for lunch). <br /> b. Please see all redlines on the attached plans, SWPPP report,and Drainage report for required <br /> corrections. These corrections should be minor, but are required in order to comply with <br /> design and construction standards as well as Ecology requirements. <br /> i. The project schedule has a start date listed of May 1St. If revisions are resubmitted <br /> sometime in the week of April 23-27,we should be able to turn the permit around <br /> for issuance around May 1st (+/- a day), provided all corrections are adequately <br /> addressed. Please contact me directly if you have any questions while working on <br /> your revisions. We can work them out via email/phone prior to your resubmittal. <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.