My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
30 112TH ST SE 2020-05-06
>
Address Records
>
112TH ST SE
>
30
>
30 112TH ST SE 2020-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 9:32:25 AM
Creation date
5/6/2020 9:30:18 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
30
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shaffer Duplex Property <br /> BMP C150: Materials on Hand <br /> BMP C162: Scheduling <br /> Element# 13: Protect On-Site Stormwater Management BMPs <br /> On-site drainage to consist mainly of roof drain to downspouts along with <br /> compost amended lawn. Roof drain dispersion flow paths and compost amended <br /> areas will be protected from compaction when feasible. <br /> BMP C102: Buffer Zones <br /> BMP C103: High Visibility Plastic or Metal Fence <br /> 2. PROJECT DESCRIPTION <br /> The proposed project is located between Meridian and 1st Avenue SE on 112th <br /> Street SE in Everett, Washington. More generally, the site is located in Section <br /> 24, Township 28 North, and Range 4 East of the Willamette Meridian in <br /> Snohomish County,Washington. Please refer to the Vicinity Map attached in the <br /> next section. <br /> The approximate 0.42-acre site is undeveloped and nearly completely forested. <br /> The proposed development consists of removing existing forest vegetation for the <br /> construction of a single-family residence with associated driveway and walkway. <br /> Utilities for the site will be taken from existing utilities within 112th Street SE. <br /> New roof, driveway, walkway, and frontage driveway cut areas total <br /> approximately 2,049 sf. Due to inadequate soil depths, stormwater infiltration is <br /> infeasible for the site. Stormwater runoff will be managed by roof drain splash <br /> blocks with more than 50 foot flow path. Disturbed lawn areas are to be compost <br /> amended per BMP T5.13. <br /> Note that project is designed to comply with the 2012 (with 2014 updates) DOE <br /> SWMMWW in conjunction with the current City of Everett Design and <br /> Construction Standards Manual. <br /> 3. EXISTING CONDITIONS <br /> The property is one tax parcel, which is undeveloped and contains existing forest <br /> and wetland areas. The property will be accessed via 112th Street SE, which lies <br /> north of the site.Vegetation on-site consists mainly of forest and wetland <br /> vegetation. On-site slopes are flat to moderate,ranging from 2%to 8%, and <br /> sloping southerly and easterly toward on-site wetlands and adjacent properties to <br /> the south and east. From a Snohomish County Soil Survey done by USDA the <br /> soils on-site consists of Alderwood-Urban Land Complex type soils. According to <br /> soil logs taken by Timothy Sarkela of Western Engineers, soils resemble gravelly <br /> silty loam. Refer to Appendix B for soil information. <br /> JOB NO:17-1666-A 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.