My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
30 112TH ST SE 2020-05-06
>
Address Records
>
112TH ST SE
>
30
>
30 112TH ST SE 2020-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 9:32:25 AM
Creation date
5/6/2020 9:30:18 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
30
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shaffer Duplex Property <br /> V <br /> Element# 7: Protect Drain Inlets <br /> Catch basin inlets near the site will be protected with catch basin sediment inserts <br /> or equivalent. <br /> BMP C220: Storm Drain Inlet Protection <br /> Element# 8: Stabilize Channels and Outlets <br /> Channels and drainage outlets are not needed around the proposed development <br /> area on site.No stabilization is necessary. Existing channels or drainage outlets <br /> located within 500-feet of the property of the property should be routinely <br /> inspected for debris that may dam and/or aid erosion. <br /> Not Applicable to This Project <br /> Element#9: Control Pollutants <br /> All pollutants from construction vehicles will be contained and disposed of in the <br /> approved manner consistent with state environmental policies. Any vehicle <br /> maintenance will be performed by authorized mechanics using drip pans and <br /> waste containment vessels. Fuel and other materials will be properly stored and <br /> contained. All pollutants will be disposed offsite at approved facilities. Concrete <br /> used in the installation of new curb cut area and sawcutting for the removal of <br /> existing sidewalk will be managed by the appropriate BMPs. <br /> BMP C151: Concrete Handling <br /> BMP C152: Sawcutting and Surface Pollution Prevention <br /> BMP C153: Material Delivery, Storage, and Containment <br /> Element# 10: Control De-Watering <br /> De-watering of the site is not expected. If dewatering of the site is needed, all <br /> groundwater removed shall be retained and recharged into the ground after de- <br /> watering has been finalized. <br /> Not Applicable to This Project <br /> Element# 11: Maintain BMPs <br /> All Temporary Erosion and Sedimentation Control (TESC) devices and <br /> equipment will be inspected and maintained on a weekly basis if not sooner, <br /> based on storm events contributing to runoff. When construction is complete and <br /> the site is stabilized, any existing sediment will be removed and stabilized onsite. <br /> BMP C150: Materials on Hand <br /> Element# 12: Manage the Project <br /> A general construction manager will manage the project for or by the owners. The <br /> construction manager shall maintain all of the above items in order to minimize <br /> sediment transport and turbid water leaving the site. His job will entail continual <br /> observation of the grading operations to ensure minimal effects to adjacent <br /> properties and offsite waterways. <br /> JOB NO:17-1666-A 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.