My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2701 12TH ST 2020-05-06
>
Address Records
>
12TH ST
>
2701
>
2701 12TH ST 2020-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 2:41:31 PM
Creation date
5/6/2020 2:34:50 PM
Metadata
Fields
Template:
Address Document
Street Name
12TH ST
Street Number
2701
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18249.10 Everett Housing AUUIUrity October 29 2018 <br /> Comment Response#2 age 5 of 8 <br /> Please see above. <br /> III. Vertical-slotted holes shall be provided in the connection plates if the beam is intended to <br /> transfer loads through direct bearing on the post. <br /> Vertical slotted holes have been called out for detail 5/S4.2 <br /> 19. This comment has not been completely addressed. The following comments shall be addressed for <br /> the headers shown in the floor and roof framing plans on Sheets A-2,A-4 and A-7, respectively: <br /> a. The south wall header shall be specified. See IBC Section 1603.1. <br /> Headers not specifically called out shall be HF#2 4x8 headers per our typical framing notes on <br /> sheet S2.1. <br /> Lateral System: <br /> 26. This comment has not been completely addressed. Section 6/54.2 has been added in response to <br /> the original comment. See IBC Section 107.2.1. The following comments should be addressed: <br /> a. The detail on Sheet A-6 should be removed. <br /> This detail have been removed. <br /> b. Sheet A-2 references Detail 5/S4.2 near the middle of the beam. Verify if the reference should <br /> be for Detail 6/S4.2. <br /> This is correct.The framing plans on Sheet A-2 have been updated for the proper detail <br /> callouts. <br /> c. The nailing requirements for the existing diaphragm sheathing to the nailer should be specified. <br /> This has been added to detail 6/S4.2.Please see the attached supplemental structural <br /> calculations dated 10/29/2018. <br /> d. Calculations shall be submitted verifying the connection of the Main Level diaphragm to the <br /> beam,including the capacity of the nailer. The nailer connection shall include loads from the <br /> Main Level diaphragm and the shear wall above. The shear loads shall include the 25%increase <br /> per ASCE 7-10 Section 12.3.3.4 Item 2. <br /> Please see the attached supplemental structural calculations dated 10/29/2018. <br /> e. The beam will act concurrently as a collector transferring shear wall loads from above to the <br /> walls at the south end of the beam. Calculations the combined loading of the beam shall be <br /> submitted for review. The axial component shall include the 25%increase per ASCE 7-10 <br /> Section 12.3.3.4 Item 2. See IBC Sections 1613.1 and 2205.1,and AISC 360-10 Section H1. <br /> Please see the attached supplemental structural calculations dated 10/29/2018. <br /> 250 4th Avenue South,Suite 200 <br /> Edmonds,WA 98020 <br /> • ph.425.778.8500 I f.425.778.5536 <br /> ENGINEERING <br /> www.cgengineering.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.