Laserfiche WebLink
18249.10 Everett Housing Aity October 29, 2018 <br /> Comment Response#2 clralge 8 of 8 <br /> Additional Comments: <br /> 31. The Holdown and Shear Wall Schedules on Sheet S2.1 have been added in response to the original <br /> review comments. The capacities in the schedules shall be identified as allowable or factored. See <br /> IBC Section 107.2.1. <br /> The table on sheet 52.1 has been updated to say"Allowable Shear Capacity" <br /> If you have any questions or comments regarding the responses to this review, please do not hesitate to <br /> call. <br /> Sincerely, <br /> CG Engineering <br /> 2.1.14fr- <br /> v <br /> Joe Galusha, PE,SE, LEED AP <br /> Associate Principal <br /> • <br /> 250 4th Avenue South,Suite 200 <br /> 0 Edmonds,WA 98020 <br /> ENGINEERING ph.425.778.8500 I f.425.778.5536 <br /> www.cge ngineeri ng.com <br />