My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1923 COLBY AVE 2020-05-07
>
Address Records
>
COLBY AVE
>
1923
>
1923 COLBY AVE 2020-05-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 2:43:05 PM
Creation date
5/7/2020 2:42:24 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1923
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fe 5. Provide minimum 50 CFM fan in the laundry"closet". Show size and location of all source <br /> 5 specific exhaust fans on plans. <br /> 3 6. Provide minimum 18"x 24"crawl space access. Show on foundation plan. <br /> It"14 <br /> 7. Dimension all post locations on foundation plan. <br /> 2 8. Dimension all partitions on the floor plans. <br /> 9. Show height calculations on elevation drawing. Label"Base Elevation"and location, <br /> provide elevation at each floor level top plate and ridge height. <br /> PM 1 10, Revise elevation drawings to show all requirements for"Core Residential Design" <br /> I requirements per city of Everett Zoning Code (refer to planning department). Incorporate <br /> all penciled in changes to the revised drawings. <br /> 11. Revise site plan"Height Calculation"to show maximum height of 28 feet. <br /> ) 12. Provide section drawing at intermediate supports in crawl space. Specify post to footing <br /> connection and post to beam connection. <br /> pl 3 13.Show all double joists and joist hangers on floor framing plans. Double joists are also <br /> 1 required under braced wall panels and bearing walls. In locations where joists are <br /> perpendicular to the bearing walls solid blocking is required. Show on framing plans. <br /> til\j 14. Provide crawl space ventilation calculations. Show size and location of all crawl space <br /> ventilation. Provide note on drawings "Provide 6 mil black moisture barrier, lap edges 12". <br /> f-e\‘4 15. Provide attic ventilation calculations. Show size and location of all attic ventilation openings. <br /> 0,4-2,) 16. Provide note on drawings that if"faced batt insulation"is installed in crawl space that the <br /> 1 9facing shall be installed in contact with the floor sheathing. <br /> ei,c)), 17.Insulation shall be permanently supported at not more than 24"O.C. Provide note on <br /> drawings. <br /> re\- ) 18. Provide"Building Section"drawing specific to this structure. Provide dimensions for the <br /> entire structure including; <br /> a. finished grade to first floor level <br /> b. finished floor to top plate at first floor <br /> c. top plate of first floor to finished second floor <br /> d. finished second floor to top plate at second floor <br /> e. top plate of second floor to top of the trusses <br /> Show and label all components in building section including plates (sill, bottom and top) <br /> joists, sheathing (floor,walls and roof), headers, insulation at floor, walls, rim joists, <br /> headers and ceiling and roof trusses. <br /> rt\Lk 19, Provide one-hour fire-resistance rated construction on the underside of projections in the <br /> 5'-0"side yard setback. No ventilation openings allowed in the roof projections located in <br /> the setback. See correction #15 above. Provide detail showing roof overhang with one- <br /> hour fire-resistance rated construction on the underside. <br /> Page 2 of 3 <br /> CITY OF EVERE I I • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax(425) 25 -: <br />
The URL can be used to link to this page
Your browser does not support the video tag.