My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3229 KROMER AVE 2020-05-08
>
Address Records
>
KROMER AVE
>
3229
>
3229 KROMER AVE 2020-05-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 9:00:31 AM
Creation date
5/8/2020 8:55:45 AM
Metadata
Fields
Template:
Address Document
Street Name
KROMER AVE
Street Number
3229
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. SWPPP NARRATIVE <br /> The intent of this section is to provide the information necessary to support the <br /> engineering plans in order to implement a design that will; reduce, eliminate or prevent the <br /> discharge of stormwater pollutants, meet or exceed the water quality and sediment <br /> management standards for the City and State, and prevent adverse impacts to the <br /> receiving waters for this project. Note; this narrative is intended to support the SWPPP <br /> that is included with the Drainage Plans also a part of this submittal package to the City. <br /> A. SITE GRADING/EROSION CONTROL RISK ASSESSMENT <br /> Area proposed to be cleared/worked: 0.14 acres <br /> Average slope for the site: 3% (Area of Disturbance Only) <br /> Erosion Hazard of Soil Low <br /> Critical Areas downslope Yes <br /> Site is upstream of an ESA Stream No <br /> Based on the above information and the fact that the area of the site to be disturbed is flat <br /> and construction site runoff will pass through silt fencing or other perimeter filtration <br /> features prior to leaving the site, and that if site conditions warrant, additional BMP's can <br /> be implemented as corrective measures the Risk Category for this site is Low Risk. <br /> B. SWPPP MINIMUM ELEMENTS / <br /> 1: Preserve Vegetation and Mark Clearing Limits AVID µ7P SALE°--riO f b L- fGA0' <br /> ,m . s 14-r-rAua,g,7 <br /> The first step in the construction process is for the contractor to flag or fence the limits of <br /> clearing/disturbance prior to any other construction activity. The engineering plans locate <br /> andprovide the square footages for the areas of grading, clearing, impervious surfaces <br /> and un-disturbed areas on the proposed site. Approximately 100% of the project parcel <br /> will be cleared or disturbed for this project. <br /> 2: Establish Construction Access <br /> The SWPPP calls for the existin• as•halt drive, - to be used as the construction <br /> entrance. Since this project will utilize the existing drivewa a construction access this <br /> feature will be available immediately and may require some mai,tenance to ensure proper <br /> function during the site work. At this time winter work is expecte• during the wet season. <br /> 3: Control Flow Rates � ¢'Fv 41..At7 <br /> This project is below the thresholds requiring flow control for the project. Z J-o' -pt raiL— <br /> ' 41A-14 <br /> 4: Install Sediment Controls N01 tS . <br /> This site SWPPP proposes to construct/maintain a gravel entrance egetative buffer, silt <br /> fencing if necessary and retention of the existing vegetation that will provide a vegetated <br /> strip between the cleared areas and any property line. The construction of these features <br /> should be completed before the clearing and grading of the site. Mulch will also be used <br /> on the exposed soil as necessary to limit erosion. <br /> 5: Stabilize Soils <br /> Kromer SFR 18-0303 <br /> April 2018 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.