Laserfiche WebLink
The "Construction Sequence" calls for the stabilization of soils that remain unworked for <br /> certain lengths of time based on the time of year. Stabilization techniques may include but <br /> not limited to mulching, plastic sheeting or hydroseeding, notes have been added to the <br /> plan regarding protection for the stock pile area if necessary. A stockpile area has been <br /> identified on the SWPPP and is setback a minimum of 10-feet from any down slope <br /> property line. <br /> 6: Protect Slopes <br /> All disturbed slopes on site during construction are required to be protected with mulch or <br /> other means as specified in the construction sequence. No concentrated runoff or <br /> significant amounts of sheet flow will be directed to new cut or fill slopes during <br /> construction. <br /> 7: Protect Drain Inlets <br /> No new inlets proposed. <br /> 8: Stabilize Channels and Outlets <br /> No new channels or outlets are proposed for this site. <br /> 9: Control Pollutants <br /> No outside chemicals are expected to be necessary for the construction of this project. <br /> Concrete truck chutes, pumps, internals and hand tools shall be washed out only into <br /> form;ed areas awaiting installation of concrete or asphalt. Unused concrete remaining in <br /> the truck and pump shall be returned to the originating batch plant for recycling. When no <br /> formed areas are available, washwater and leftover product shall be contained in a lined <br /> container and disposed of in a manner that does not violate water quality standards. All <br /> vehicles working on and around the site would need to meet the State requirements for <br /> emissions. A drip pan or other appropriate temporary containment device shall be placed <br /> at locations where leaks or spills may occur during the fueling or maintenance of <br /> machinery. <br /> 10: Control DeWatering <br /> DeWatering runoff shall be directed to retained vegetated areas on-site. <br /> 11: Maintain BMPs <br /> The construction supervisor will be responsible for maintaining all BMPs during <br /> construction and working with the City of to rel, to or add BMPs as necessary <br /> as site conditions change. E .-rte <br /> 12: Manage the Project <br /> It will be the responsibility of the Contractor and Developer to manage this project and <br /> coordinate with the City Inspector and Engineer. <br /> Inspection and Monitoring: <br /> Site inspections shall be doneby a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. The person must have skills to first assess the <br /> site conditions and construction activities that could impact the quality of stormwater, and <br /> Kromer SFR 18-0303 <br /> April 2018 Page 7 <br />