My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shearer and Associates Inc 3/9/2020
>
Contracts
>
Capital Contract
>
Shearer and Associates Inc 3/9/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:56:52 AM
Creation date
5/13/2020 11:55:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Shearer and Associates Inc
Approval Date
3/9/2020
Council Approval Date
2/12/2020
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WFP East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0002306
Total Compensation
$3,368,386.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br /> ARTICLE 1. GENERAL 1 <br /> 1.1 Location 1 <br /> 1.2 Definitions 1 <br /> ARTICLE 2. EXISTING SITE AND FACILITY INFORMATION 1 <br /> 2.1 Existing Site and Facility Information 1 <br /> ARTICLE 3.SCOPE OF WORK 3 <br /> 3.1 General Scope of Work 3 <br /> ARTICLE 4. OWNER'S PROJECT CRITERIA 3 <br /> 4.1 General 3 <br /> 4.2 Codes,Standards, and Guidelines 4 <br /> 4.3 Performance and General Design Criteria 5 <br /> 4.3.1 East Clearwell 5 <br /> 4.4 Structural Design 8 <br /> 4.5 Acceptable Materials 8 <br /> 4.6 Repair Work 9 <br /> 4.6.1 Wash Down Piping 9 <br /> 4.6.2 East Clearwell Leakage 10 <br /> 4.7 East Clearwell Cleaning and Disinfection 10 <br /> 4.7.1 General 10 <br /> 4.7.2 East Clearwell 10 <br /> ARTICLE 5. CONSTRUCTION 10 <br /> 5.1 General 10 <br /> 5.2 Hours of Construction 10 <br /> 5.3 Site Access 11 <br /> 5.3.1 Project Site 11 <br /> 5.4 Site Preparation and Staging 11 <br /> 5.4.1 General 11 <br /> 5.5 Temporary Facilities and Utilities 12 <br /> 5.6 Non-interference with Ongoing Water Supply Operations 12 <br /> 5.7 Notification Requirements 13 <br /> 5.8 Health and Safety 13 <br /> 5.9 Housekeeping 13 <br /> 5.10 Construction Control and Environmental Protection 13 <br /> 5.10.1 Erosion Control 13 <br /> 5.10.2 Spill Prevention and Control 14 <br /> 5.10.3 Compliance with Environmental Regulations 14 <br /> 5.11 Construction Documentation 14 <br /> 5.11.1 Pre-construction Documentation of Existing Conditions 14 <br /> 5.11.2 East Clearwell Existing Floor and Wall Protection 15 <br /> 5.11.3 Construction Photographs 15 <br /> 5.11.4 Record Drawings 15 <br /> 5.12 Repair of Damage Caused by Design-Builder 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.