Laserfiche WebLink
ARTICLE 6. DEMOLITION 16 <br /> 6.1 General Requirements 16 <br /> 6.2 Salvage 16 <br /> 6.3 East Clearwell Roof System Demolition Requirements 17 <br /> ARTICLE 7.SITE RESTORATION AND CLEANUP 17 <br /> ARTICLE 8. EAST CLEARWELL ROOF WATER-TIGHTNESS TESTING 18 <br /> 8.1 Roof 18 <br /> 8.1.1 Test Plan 18 <br /> 8.1.2 Conduct of Tests 18 <br /> 8.2 Clearwell Leakage 18 <br /> 8.2.2 Test Plan 18 <br /> ARTICLE 9.SUBMITTALS AND MEETINGS 19 <br /> 9.1 Interim Design Submissions 19 <br /> 9.2 Construction Submissions 19 <br /> 9.3 Meetings and Communications 19 <br /> 9.3.1 Design 19 <br /> 9.3.2 Construction 20 <br /> ARTICLE 10. EXTENDED INTEGRATED ROOF WARRANTY 20 <br /> ARTICLE 11. FORM OF PERFORMANCE AND PAYMENT BONDS 20 <br /> ATTACHMENT 10.1. EXTENDED WARRANTY TERMS AND CONDITIONS [TO BE INSERTED AFTER <br /> PROPOSAL SUBMITTAL] <br /> ATTACHMENT 11.1. PAYMENT AND PERFORMANCE BOND FORMS <br /> iv <br />