My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shearer and Associates Inc 3/9/2020
>
Contracts
>
Capital Contract
>
Shearer and Associates Inc 3/9/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:56:52 AM
Creation date
5/13/2020 11:55:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Shearer and Associates Inc
Approval Date
3/9/2020
Council Approval Date
2/12/2020
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WFP East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0002306
Total Compensation
$3,368,386.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.6.2 East Clearwell Leakage <br /> The East Clearwell structure currently has no significant leakage after filling cracks and joints in <br /> 2017. Design-Builder shall take precautions to protect all newly filled cracks and joints during <br /> demolition and new roof construction. <br /> 4.7 East Clearwell Cleaning and Disinfection <br /> 4.7.1 General <br /> Before refilling completed facilities, including the East Clearwell and pipelines, Design-Builder shall <br /> clean the East Clearwell and pipelines in accordance with applicable standards and procedures, <br /> including but not limited to: WAC 246-290-451, WSDOH, and ANSI/AWWA Standards C652 (Method <br /> 3) and C651, and coordinate disinfection with the City.All materials used for cleaning and <br /> disinfection of potable water tank and system interiors shall conform to the applicable requirements <br /> of ANSI/NSF 60 and 61. <br /> 4.7.2 East Clearwell <br /> Immediately prior to disinfection, Design-Builder shall remove all temporary structures and debris, <br /> and wash all interior surfaces with clean water using a high-pressure water device.All water,dirt, and <br /> foreign material accumulated in this cleaning process shall be removed from the East Clearwell. <br /> Following cleaning, Design-Builder shall arrange for Owner's Representative to inspect and verify that <br /> cleaning requirements have been met. <br /> Upon the City's acceptance of Design-Builder's cleaning process,the City will conduct refill and <br /> disinfection operations.After completion of East Clearwell disinfection, City will conduct testing <br /> activities in accordance with WDOH requirements to confirm absence of coliform organisms and <br /> chlorine residual. If the initial disinfection fails, water in the clearwell will be chlorinated and retested <br /> until satisfactory results are obtained. <br /> The East Clearwell shall not be put back on-line without written approval from the Owner's <br /> Representative. <br /> ARTICLE 5. CONSTRUCTION <br /> 5.1 General <br /> The requirements of this article apply to all construction related activities, including demolition,site <br /> restoration, and testing activities further described in Articles 6,7, and 8, respectively. <br /> 5.2 Hours of Construction <br /> Design-Builder shall only conduct construction-related activities between the following hours: <br /> • Monday through Friday-6:00 AM to 6:00 PM. <br /> • Weekends: Generally, no construction activity work will be allowed. Occasional work on <br /> weekends may be allowed subject to approval by the Owner's Representative, but no earlier <br /> than 8:00 AM and no later than 6:00 PM. <br /> City of Everett January 29,2020 <br /> Water Filtration Plant East Clearwell Roof Replacement DB Project Supplementary Conditions Page 10 <br />