Laserfiche WebLink
5.3 Site Access <br /> 5.3.1 Project Site <br /> Access to the East Clearwell shall be via the primary site access gate as shown on the site plan <br /> below. A map of existing facilities and yard piping is available for download (see Table 2.1). <br /> h ; <br /> 1 <br /> POWER UTILITY <br /> LINES <br /> (APPROX) <br /> :1119111: <br /> WEST 141PUD LIGHT <br /> CLEARWELL POLES <br /> (APPROX) <br /> ;maµ <br /> EQUIPMENT <br /> HEAVY _ <br /> ACCESS FOR <br /> EQUIPMENT - ROOF <br /> RESTRICTED , y REPLACEMENT <br /> TO PROTECT <br /> BURIED WEST <br /> CLEARWELL <br /> ENTRANCE <br /> GATE <br /> Figure 1.Water Filtration Plant Site Access and Limitations <br /> 5.4 Site Preparation and Staging <br /> 5.4.1 General <br /> The following requirements apply to construction: <br /> City of Everett January 29,2020 <br /> Water Filtration Plant East Clearwell Roof Replacement DB Project Supplementary Conditions Page 11 <br />