My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shearer and Associates Inc 3/9/2020
>
Contracts
>
Capital Contract
>
Shearer and Associates Inc 3/9/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:56:52 AM
Creation date
5/13/2020 11:55:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Shearer and Associates Inc
Approval Date
3/9/2020
Council Approval Date
2/12/2020
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WFP East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0002306
Total Compensation
$3,368,386.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. <br /> DESIGNATED CONSTRUCTION PROJECT(S) <br /> GENERAL AGGREGATE LIMIT SUBJECT TO A <br /> TOTAL POLICY AGGREGATE LIMIT <br /> This endorsement modifies insurance provided under the following: <br /> COMMERCIAL GENERAL LIABILITY COVERAGE PART <br /> PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART <br /> SCHEDULE <br /> Designated Construction Projects: <br /> Subject to an Overall Policy General Aggregate Limit of$5,000,000, the General Aggregate Limit under Limits <br /> of Insurance (Section III)applies separately to each of your"projects"away from premises owned by or rented <br /> to you. <br /> (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable <br /> to this endorsement.) <br /> A. For all sums which the insured becomes legally obligated to pay as damages caused by "occurrences" under <br /> COVERAGE A (SECTION I), which can be attributed only to ongoing operations at a single designated construction <br /> project shown in the Schedule above: <br /> 1. A separate Designated Construction Project General Aggregate Limit applies to each designated construction project, <br /> and that limit is equal to the amount shown in the Declarations of this policy. <br /> 2. Subject to the Total Policy Aggregate Limit, the Designated Construction Project General Aggregate Limit is the most <br /> we will pay for the sum of all damages under COVERAGE A, except damages because of"bodily injury" or"property <br /> damage"included in the"products-completed operations hazard,"regardless of the number of: <br /> a. Insured's; <br /> b. Claims made or"suits"brought;or <br /> c. Persons or organizations making claims or bringing"suits." <br /> FMIC-GL-2017(01/2011) Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.