My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shearer and Associates Inc 3/9/2020
>
Contracts
>
Capital Contract
>
Shearer and Associates Inc 3/9/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:56:52 AM
Creation date
5/13/2020 11:55:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Shearer and Associates Inc
Approval Date
3/9/2020
Council Approval Date
2/12/2020
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WFP East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0002306
Total Compensation
$3,368,386.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.Any payments made under COVERAGE A for damages shall reduce the Designated Construction Project General <br /> Aggregate Limit for that designated construction project. Subject to the Policy Aggregate Limit, such payments shall <br /> not reduce the General Aggregate Limit shown in the Declarations nor shall they reduce any other Designated <br /> Construction Project General Aggregate Limit for any other designated construction project shown in the Schedule <br /> above. <br /> 4. The limits shown in the Declarations for Each Occurrence continue to apply. However, instead of being subject to the <br /> General Aggregate Limit shown in the Declarations, such limits will be subject to the applicable Designated <br /> Construction Project General Aggregate Limit and the Total Policy Aggregate Limit. <br /> B. For all sums which the insured becomes legally obligated to pay as damages caused by`occurrences"under COVERAGE <br /> A (SECTION I),which cannot be attributed only to ongoing operations at a single designated construction project shown in <br /> the Schedule above: <br /> 1. Any payments made under COVERAGE A for damages shall reduce the amount available under the General <br /> Aggregate Limit or the Products-Completed Operations Aggregate Limit,whichever is applicable; and <br /> 2. Such payments shall not reduce any Designated Construction Project General Aggregate Limit. <br /> 3. Such payments will reduce the Policy Aggregate Limit. <br /> C. When coverage for liability arising out of the "products-completed operations hazard" is provided, any payments for <br /> damages because of"bodily injury"or"property damage"included in the products-completed operations hazard will reduce <br /> the Products-Completed Operations Aggregate Limit, and not reduce the General Aggregate Limit, the Designated <br /> Construction Project General Aggregate Limit nor the Total Policy Aggregate Limit. <br /> D. If the applicable designated construction project has been abandoned, delayed, or abandoned and then restarted, or if the <br /> authorized contracting parties deviate from plans, blueprints,designs, specifications or timetables, the project will still be <br /> deemed to be the same construction project. <br /> E. The Total Policy Aggregate Limit scheduled in the Declarations of this policy is the most we will pay for the sum of:(a) all <br /> damages covered under this policy and falling within the scheduled Designated Construction Project General Aggregate <br /> Limits described in Paragraph A. of this endorsement; and, (b) all damages covered under this policy and falling within the <br /> General Aggregate Limit, as described in Paragraph B. of this endorsement and as set forth in the provisions of Limits of <br /> Insurance (SECTION III) not otherwise modified by this endorsement. The Total Policy Aggregate Limit applies regardless <br /> of the sums indicated in the Declarations for any General Aggregate Limit, or Designated Construction Project General <br /> Aggregate Limit, as applicable to all construction projects set forth in the Schedule above. The Total Policy Aggregate <br /> Limit applies collectively, rather than separately, to all of your scheduled construction projects. The Total Policy Aggregate <br /> Limit is not reduced by payments for damages covered under this policy and falling within the "products-completed <br /> operations hazard," but such payments will reduce the Products-Completed Operations Aggregate Limit, as described in <br /> Paragraph C. of this endorsement. <br /> F. The provisions of Limits Of Insurance(SECTION III)not otherwise modified by this endorsement shall continue to apply as <br /> stipulated <br /> ALL OTHER TERMS AND CONDITIONS OF THE POLICY REMAIN UNCHANGED. <br /> This endorsement forms a part of the Policy to which attached, effective on the inception date of the Policy unless <br /> otherwise stated herein. <br /> (The following information is required only when this endorsement is issued subsequent to preparation of the Policy.) <br /> Endorsement effective Policy No. Endorsement No. <br /> Named Insured <br /> Countersigned by <br /> FMIC-GL-2017 (01/2011) Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.