My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shearer and Associates Inc 3/9/2020
>
Contracts
>
Capital Contract
>
Shearer and Associates Inc 3/9/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:56:52 AM
Creation date
5/13/2020 11:55:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Shearer and Associates Inc
Approval Date
3/9/2020
Council Approval Date
2/12/2020
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WFP East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0002306
Total Compensation
$3,368,386.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POLICY NUMBER: WA-CGL-0000015564-08 COMMERCIAL GENERAL LIABILITY <br /> CG 25 03 05 09 <br /> DESIGNATED CONSTRUCTION PROJECT(S) <br /> GENERAL AGGREGATE LIMIT <br /> This endorsement modifies insurance provided under the following: <br /> COMMERCIAL GENERAL LIABILITY COVERAGE PART <br /> SCHEDULE <br /> Designated Construction Project(s): <br /> Any project: 1)covered under this policy; and 2) required by written contract with you to be subject to a separate <br /> General Aggregate limit. <br /> Information required to complete this Schedule, if not shown above, will be shown in the Declarations. <br /> A. For all sums which the insured becomes legally 3. Any payments made under Coverage A for <br /> obligated to pay as damages caused by damages or under Coverage C for medical <br /> "occurrences"under Section I —Coverage A,and expenses shall reduce the Designated <br /> for all medical expenses caused by accidents Construction Project General Aggregate Limit <br /> under Section I — Coverage C, which can be for that designated construction project. Such <br /> attributed only to ongoing operations at a single payments shall not reduce the General <br /> designated construction project shown in the Aggregate Limit shown in the Declarations <br /> Schedule above: nor shall they reduce any other Designated <br /> 1. A separate Designated Construction Project Construction Project General Aggregate Limit <br /> General Aggregate Limit applies to each for any other designated construction project <br /> designated construction project, and that limit shown in the Schedule above. <br /> is equal to the amount of the General 4. The limits shown in the Declarations for Each <br /> Aggregate Limit shown in the Declarations. Occurrence, Damage To Premises Rented To <br /> 2. The Designated Construction Project General You and Medical Expense continue to apply. <br /> Aggregate Limit is the most we will pay for the However, instead of being subject to the <br /> sum of all damages under Coverage A, General Aggregate Limit shown in the <br /> except damages because of"bodily injury" or Declarations, such limits will be subject to the <br /> "property damage" included in the "products- applicable Designated Construction Project <br /> completed operations hazard", and for General Aggregate Limit. <br /> medical expenses under Coverage C <br /> regardless of the number of: <br /> a. Insureds; <br /> b. Claims made or"suits"brought;or <br /> c. Persons or organizations making claims or <br /> bringing"suits". <br /> CG 25 03 05 09 ©Insurance Services Office, Inc., 2008 Page 1 of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.