My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shearer and Associates Inc 3/9/2020
>
Contracts
>
Capital Contract
>
Shearer and Associates Inc 3/9/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:56:52 AM
Creation date
5/13/2020 11:55:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Shearer and Associates Inc
Approval Date
3/9/2020
Council Approval Date
2/12/2020
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WFP East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0002306
Total Compensation
$3,368,386.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. For all sums which the insured becomes legally C. When coverage for liability arising out of the <br /> obligated to pay as damages caused by "products-completed operations hazard" is <br /> "occurrences" under Section I — Coverage A, and provided, any payments for damages because of <br /> for all medical expenses caused by accidents under "bodily injury" or"property damage" included in the <br /> Section I — Coverage C, which cannot be attributed "products-completed operations hazard"will reduce <br /> only to ongoing operations at a single designated the Products-completed Operations Aggregate <br /> construction project shown in the Schedule above: Limit, and not reduce the General Aggregate Limit <br /> 1. Any payments made under Coverage A for nor the Designated Construction Project General <br /> damages or under Coverage C for medical Aggregate Limit. <br /> expenses shall reduce the amount available D. If the applicable designated construction project <br /> under the General Aggregate Limit or the has been abandoned, delayed, or abandoned and <br /> Products-completed Operations Aggregate then restarted, or if the authorized contracting <br /> Limit,whichever is applicable; and parties deviate from plans, blueprints, designs, <br /> 2. Such payments shall not reduce any Designated specifications or timetables, the project will still be <br /> Construction Project General Aggregate Limit. deemed to be the same construction project. <br /> E. The provisions of Section III — Limits Of Insurance <br /> not otherwise modified by this endorsement shall <br /> continue to apply as stipulated. <br /> Page 2 of 2 © Insurance Services Office, Inc., 2008 CG 25 03 05 09 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.