My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County Dept of Emergency Management 4/2/2020
>
Contracts
>
6 Years Then Destroy
>
2020
>
Snohomish County Dept of Emergency Management 4/2/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 11:12:38 AM
Creation date
5/13/2020 12:47:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County Dept of Emergency Management
Approval Date
4/2/2020
Council Approval Date
3/18/2020
End Date
12/31/2020
Department
Police
Department Project Manager
Tracey Landry
Subject / Project Title
FBI Hazardous Devices School E19-089 Grant
Tracking Number
0002308
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
Document Relationships
Snohomish County Dept of Emergency Mangement 7/22/2020 Amendment
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement End Date, except as otherwise authorized by written amendment of this Agreement <br /> and issued by the County. <br /> i. No costs for purchases of equipment/supplies will be reimbursed until the related <br /> equipment/supplies have been received by the Subrecipient, its contractor, or any non-federal <br /> entity to which the Subrecipient makes a subaward, and is invoiced by the vendor. <br /> j. Failure to submit timely, accurate, and complete reports as required by this Agreement(including, <br /> but not limited to, those reports in the Timeline [Attachment 2]) will prohibit the Subrecipient from <br /> being reimbursed until such complete reports are submitted and the County has had reasonable <br /> time to conduct its review. <br /> k. Final reimbursement requests will not be approved for payment until the Subrecipient is current <br /> with all reporting requirements contained in this Agreement. <br /> I. A written amendment will be required if the Subrecipient expects cumulative transfers among <br /> project budgets, as identified in the Work Plan and Budget (Attachment 2), to exceed 10% of the <br /> Grant Agreement Amount. Any adjustments to project totals other than in compliance with this <br /> paragraph will not be reimbursed. <br /> m. Subrecipients shall only use federal award funds under this Agreement to supplement existing <br /> funds and will not use them to replace (supplant) non-federal funds that have been budgeted for <br /> the same purpose. The Subrecipient may be required to demonstrate and document that the <br /> reduction in non-federal resources occurred for reasons other than the receipt or expected receipt <br /> of federal funds. <br /> 3. REPORTING <br /> a. With each reimbursement request, the Subrecipient shall report how the expenditures, for which <br /> reimbursement is sought, relate to the Work Plan (Attachment 2) activities in the format provided <br /> by the County. <br /> b. With the final reimbursement request, the Subrecipient shall submit to the County Key Personnel <br /> a final report describing all completed activities under this Agreement. <br /> c. The Subrecipient shall comply with the Federal Funding Accountability and Transparency Act <br /> (FFATA) and related OMB Guidance consistent with Public Law 109-282 as amended by section <br /> 6202(a) of Public Law 110-252 (see 31 U.S.C. 6101 note) and complete and return to the County <br /> the FFATA Form located at http://mil.wa.gov/emergency-management- <br /> division/grants/requiredgrantforms; which is incorporated by reference and made a part of this <br /> Agreement. <br /> d. SHSP subrecipients shall participate in the Stakeholder Preparedness Review (SPR) process, <br /> formerly known as the State Preparedness Report. <br /> 4. EQUIPMENT AND SUPPLY MANAGEMENT <br /> a. The Subrecipient and any non-federal entity to which the Subrecipient makes a subaward shall <br /> comply with 2 CFR 200.318 — 200.326 when procuring any equipment or supplies under this <br /> Agreement, 2 CFR 200.313 for management of equipment, and 2 CFR 200.314 for management <br /> of supplies, to include, but not limited to: <br /> i. Upon successful completion of the terms of this Agreement, all equipment and supplies <br /> purchased through this Agreement will be owned by the Subrecipient, or a recognized non- <br /> federal entity to which the Subrecipient has made a subaward, for which a contract, <br /> subrecipient grant agreement, or other means of legal transfer of ownership is in place. <br /> ii. All equipment, and supplies as applicable, purchased under this Agreement will be recorded <br /> and maintained in the Subrecipient's inventory system. <br /> iii. Inventory system records shall include: <br /> A. description of the property <br /> B. manufacturer's serial number, model number, or other identification number; <br /> C. the source of funding for the equipment, including the Federal Award Identification <br /> Number (FAIN) <br /> DHS-EMD-SnoCo.-SHSP-FFY18 Page 5 of 38 E19-089—Everett PD <br />
The URL can be used to link to this page
Your browser does not support the video tag.