Laserfiche WebLink
Interwest Construction,Inc. <br /> Job Name: Everett Grand Ave Bridge Job Code: 1157 <br /> Cost Code Review <br /> Cost Code: 9115 12 In SSFM Fabrication Changes FA <br /> Code Description Class Reg.Hours OT Hours Other Hours <br /> Date: 02/26/2020 Foreman: HASTNATR Shift: 1 <br /> Time Card: <br /> Production Quantities: 0.000 <br /> PECKPARS Parker S Peck CL 5.00 0.00 0.00 <br /> MCKAGRAL Grant L McKay 02 4.00 0.00 0.00 <br /> MORGRYAJ Ryan J Morgan L3 4.00 0.00 0.00 <br /> GANDJUSM Justin M Gandy L3 8.00 0.00 0.00 <br /> SMITTRIR Tristan RD Smith L3 8.00 0.00 0.00 <br /> Labor Totals: Hours - 29.0 <br /> Equip Totals: Hours - 0.0 <br /> Cost Code Notes: <br /> Slot: 5 <br /> Company Note: It and install mount or 12" pipe. Start to drill holes. <br /> Prep and cut angle iron for supporting dr. Sueuss pipe to building. <br /> Replace angle iron temp hangers with new hangers. 2 locations <br /> Indexes: <br /> Inspector Note: <br /> Printed on: 03/31/2020 13:28:58 <br /> x Date: <br /> Attendance/Non-Use Codes included in Hours.None/None Page 4 <br />