Laserfiche WebLink
Interwest Construction,Inc. <br /> Job Name: Everett Grand Ave Bridge Job Code: 1157 <br /> Cost Code Review <br /> Cost Code: 9115 12 In SSFM Fabrication Changes FA <br /> Code Description Class Reg.Hours OT Hours Other Hours <br /> Date: 02/27/2020 Foreman: HASTNATR Shift: 1 <br /> Time Card: <br /> Production Quantities: 0.000 <br /> HASTNATR Nathan R Hastings CF 1.00 0.00 0.00 <br /> 08-67 Dodge 1 Ton Quad Cab 1.00 0.00 0.00 <br /> PECKPARS Parker S Peck CL 4.00 0.00 0.00 <br /> RAMOADAL Adalberto Ramos Jr. CA6 4.00 0.00 0.00 <br /> GANDJUSM Justin M Gandy L3 2.00 0.00 0.00 <br /> SMITTRIR Tristan RD Smith L3 2.00 0.00 0.00 <br /> Labor Totals: Hours - 13.0 <br /> Equip Totals: Hours - 1.0 <br /> Cost Code Notes: <br /> Slot: 5 <br /> Company Note: Finish mounting 12" pipe to wall @ dr. Sueuss pipe. Finish painting <br /> Indexes: <br /> Inspector Note: <br /> Printed on: 03/31/2020 13:28:58 <br /> x Date: <br /> Attendance/Non-Use Codes included in Hours:None/None Page 5 <br />