Laserfiche WebLink
Interwest Construction,Inc. <br /> Job Name: Everett Grand Ave Bridge Job Code: 1157 <br /> Cost Code Review <br /> Cost Code: 9115 12 In SSFM Fabrication Changes FA <br /> Code Description Class Reg.Hours OT Hours Other Hours <br /> Date: 02/28/2020 Foreman: HASTNATR Shift: 1 <br /> Time Card: <br /> Production Quantities: 0.000 <br /> HASTNATR Nathan R Hastings CF 3.50 0.00 0.00 <br /> 08-67 Dodge 1 Ton Quad Cab 3.50 0.00 0.00 <br /> PECKPARS Parker S Peck CL 3.50 0.00 0.00 <br /> RAMOADAL Adalberto Ramos Jr. CA6 3.50 0.00 0.00 <br /> Labor Totals: Hours - 10.5 <br /> Equip Totals: Hours - 3.5 <br /> Cost Code Notes: <br /> Date: 03/04/2020 Foreman: HASTNATR Shift: 1 <br /> Time Card: <br /> Production Quantities: 0.000 <br /> HASTNATR Nathan R Hastings CF 1.00 0.00 0.00 <br /> 08-67 Dodge 1 Ton Quad Cab 1.00 0.00 0.00 <br /> PECKPARS Parker S Peck CL 1.00 0.00 0.00 <br /> Labor Totals: Hours - 2.0 <br /> Equip Totals: Hours - 1.0 <br /> Cost Code Notes: <br /> Slot: 14 <br /> Company Note: Modifying the ends of channel. Every end gets squared up. <br /> Indexes: <br /> Inspector Note: <br /> Printed on: 03/31/2020 13:28:58 <br /> x Date: <br /> Attendance/Non-Use Codes included in Hours:None/None Page 6 <br />