Interwest Construction Inc. 4/28/2020 Change Order 22
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 4/28/2020 Change Order 22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 10:55:24 AM
Creation date
5/18/2020 10:54:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
4/28/2020
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
22
Tracking Number
0000801
Total Compensation
$55,806.27
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br /> Change Order No.: 22 <br /> Change Order Effective Date: 4-08-2020 <br /> 1. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work.In <br /> calculating such threshold amounts,Washington State sales tax,if applicable to the <br /> Work,has been considered. <br /> 2. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 3. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order,including, but <br /> not limited to,claims for equitable adjustment of time and compensation, delay,impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition,protest,dispute,claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition,protest,dispute,claim,or Contract Claim that ends <br /> after the date of this Change Order,but relates to work performed prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 4. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: fiffieedothteitity Attorney <br /> APPV A FOR <br /> David C. HailED S, CityTO AttornMey <br /> C1,'VI <br /> Mayor City Cle City Attorney <br /> Date: Z Date: 7 Date: 1I.2i0.27 <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> a, Not applicable <br /> Date: 1 --T-22 Date: 4-i4-20 0 Date: D e: <br /> Page 2 of 3 <br />