My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 4/28/2020 Change Order 22
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 4/28/2020 Change Order 22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 10:55:24 AM
Creation date
5/18/2020 10:54:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
4/28/2020
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
22
Tracking Number
0000801
Total Compensation
$55,806.27
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br /> Change Order No.: 22 <br /> Change Order Effective Date: 4-08-2019 <br /> CONTRACTOR <br /> 2/7 <br /> By J. <br /> Officer Date: i /Z c <br /> Exhibit A—Description of Changed Work <br /> 12in FM and Electrical Modifications at West Tower due to Structural Conflicts: <br /> • The west side of the truss bridge was in direct conflict with the installation of the 12"vertical <br /> forcemain as it came out of the west tower roof Modifcation to the piping and bracing was <br /> required in order to reroute the 12"FM. Cost also included additional heat trace and insulation <br /> modifications. The electrical conduit that was to penetrate the north side of the roof was also in <br /> conflict with the truss bridge. Additional SS J-boxes and re-routing of conduit to the SW <br /> corner of the utility roof was required. <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0(zero)working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> See attached for new bid item. <br /> Submittals <br /> N/A <br /> Measurement and Payment <br /> Time and material was tracked by Interwest and Electric West and confirmed by the City of Everett <br /> Inspector and KBA Resident Engineer. Payment will be by Lump Sum. <br /> ATTACHMENTS <br /> • ICI Time and Material Tracking for FM Modifications. (21 pages) <br /> • Electric West Time and Material Tracking for Electrical Changes (29 pages) <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.