Laserfiche WebLink
INTERWEST <br /> CONSTRUCTION <br /> INC. Summary of Additional Work <br /> Project Number Project Name Contractor <br /> 1157 Grand Avenue Park Bridge Interwest Construction, Inc. <br /> Date of the Work Item Number Item Name <br /> 12"SSFM Revisions-Conduit System Changes <br /> Description of Work Performed <br /> Work by Electric West to re-configure the electrical and communication conduit design for de-confliction with the SSFM and the bridge truss <br /> members. Required changes on the bridge and to the penetration of the utility room roof(originally north side,now southwest). The work <br /> required additional materials including SS junction boxes and support members. <br /> Time Worked Record <br /> Labor Hours Worked <br /> Name of Workers Occupation Reg. OT DT Reg. Rate O.T.Rate D.T.Rate Amount <br /> Labor Subtotal $ - <br /> Markup @ 29% $ - <br /> Labor Total $ - <br /> Equipment Hours Worked <br /> Equipment#/Type/Size Reg. Standby Reg. Rate SB Rate Amount <br /> Equipment Subtotal $ - <br /> Markup @21% $ - <br /> Equipment Total $ - <br /> Materials <br /> Description Supplier Invoice Quantity Unit Unit Price Amount <br /> Materials Subtotal $ - <br /> Sales Tax on Materials @ 9.7% $ - <br /> Markup @21% $ - <br /> Materials Total $ - <br /> Subcontractor Work <br /> Description of Work Subcontractor Invoice Quantity Unit Unit Price Amount <br /> Conduit and J-Box Mods Electric West EW COP 10 1 LS $ 27,600.00 $ 27,600.00 <br /> Subcontractor Subtotal $ 27,600.00 <br /> Markup @ 7% $ 1,932.00 <br /> Subcontractor Total $ 29,532.00 <br /> 'SHEET TOTAL $ 29,532.00 <br /> Notes: <br /> City of Everett Date Contractor's Representative Date <br /> 609 N. Hill Blvd,Burlington,WA 98233 (360)757-7574 <br />