Laserfiche WebLink
COP10 <br /> ELECTRIC WEST, INC. <br /> CHANGE ORDER PROPOSAL <br /> GAPB <br /> ICI <br /> Utility Conduit Force Account <br /> Description: <br /> 1 DIRECT LABOR <br /> Job <br /> Classification Wage Rate Hours Cost <br /> Foreman 84.62 17 $1,438.54 <br /> JW 79.19 95 $7,523.05 <br /> App 63.02 11.5 $724.73 <br /> Subtotal $9,686.32 <br /> Allowable mark up 29% $2,809.03 <br /> Total Labor Cost $12,495.35 <br /> 2 MATERIALS <br /> Description Quantity Units Unit Price Cost <br /> Not Taxed Material 1 LS $10,507.50 $10,507.50 <br /> Taxed Material 1 LS $853.67 $853.67 <br /> $0.00 <br /> shipping 1 $92.77 $92.77 <br /> Use Tax 9.80% $1,029.74 $1,029.74 <br /> Allowable mark up 21% $2,621.57 <br /> Total Material Cost $15,105.25 <br /> 3 EQUIPMENT Proposed <br /> Description Rental Rates Time Cost <br /> $0.00 <br /> $0.00 <br /> $0.00 <br /> Overhead&Profit 21% $0.00 <br /> Total Cost of Equipment $0.00 <br /> 4 SERVICES <br /> Description Rental Rates Time Cost <br /> $0.00 <br /> $0.00 <br /> Allowable mark up 21% $0.00 <br /> Total Cost of Services $0.00 <br /> 5 FORCE ACCOUNT MOBILIZATION $0.00 <br /> 6 SUBCONTRACTORS $0.00 <br /> 7 CONTRACTOR MARK UP ON SUBCONTRACTORS 12% $0.00 <br /> 8 ADDITIONAL CONTRACT DAYS REQUIRED 0 <br /> TOTAL COST OF PROPOSED CHANGE $27,600.60 <br /> Electric West reserves all contractual and legal rights to modify or supplement this Change Order to reflect <br /> additional cost or schedule impacts,and nothing herein shall be construed as a waiver of such rights. <br />