|
Cost Types: LPBF I Cost Codes: 442.99.010 I Print Landscape if possible: Yes I Show Inventory: Description I Show Cost Type Totals: All I Labor Detail
<br /> Job Detail Report Page 1
<br /> Electric West, Inc. 4/212009:47
<br /> 4/2/2020 LO 12.0.200228
<br /> Job: 442 Grand Ave Pedestrian Bridge Contract: 819,200.00
<br /> 1620 W. Marine View Dr.(West) Change Orders: 0.00
<br /> 1620 Grand Ave. (East) Revised: 819,200.00
<br /> Everett, WA 98201 Prey. Billed: 0.00
<br /> Open: 819,200.00
<br /> Contract Billings Cost Hours Date
<br /> Cat. Description pate Invoice EQ,. Amount To Date Actual Budget Overrun Actual Budget Q er Quantity Bi11 Cal Posted Billing Cycle
<br /> Eb se: 99 - Change Orders
<br /> 010 Utility Conduit FA 0.00 0.00
<br /> L 10/15/2019 JYM Change in roof penetrations FA 46.45 1:00 10/21/2019
<br /> 301
<br /> Andy A Graves
<br /> B 10/15/2019 JYM FICA,FUTA,SUTA,Workers Comp 7.47 10/21/2019
<br /> Andy A Graves
<br /> L 10/16/2019 JYM Planning 46.45 otelt00 10/21/2019
<br /> Andy A Graves
<br /> B 10/16/2019 JYM FICA,FUTA,SUTA,Workers Comp 7.48 10/21/2019
<br /> Andy A Graves
<br /> L 10/22/2019 110YM Plan,meet with ken and don, 185.80 sih00. 10/28/2019
<br /> order material
<br /> Andy A Graver".
<br /> B 10/22/2019 JYM FICA,FUTA,SUTA,Workers Comp 29.90 10/28/2019
<br /> Andy A Graves
<br /> L 10/24/2019 OM' Bending rigid for Inside tower 92.90 00 . 10/28/2019
<br /> corn,spares
<br /> Andy A Graves I'
<br /> B 10/24/2019 JYM FICA,FUTA,SUTA,Workers Comp 14.95 10/28/2019
<br /> Andy A Graves
<br /> i
<br /> L 10/24/2019 80% Alex L.Padilla 73.26 OW90t4w 10/28/2019 (""-
<br /> B 10/24/2019 '80% FICA,FUTA,SUTA,Workers Comp 12.35 10/28/2019 r"β,
<br /> Alex L.Padilla
<br /> L 10/25/2019 'JYM* ,.. Materials 46.45 4600a. 10/28/2019
<br /> Andy A Graves C---1
<br /> B 10/25/2019 JYM FICA,FUTA,SUTA,Workers Comp 6.77 10/28/2019
<br /> Andy A Graves
<br /> L 10/25/2019 80% gather materials 36.63 00, 10/28/2019
<br /> Alex L.Padilla
<br /> B 10/25/2019 80% FICA,FUTA,SUTA,Workers Comp 6.17 10/28/2019
<br /> Alex L.Padilla
<br /> L 10/28/2019 Unload conduit and boxes 46.45 βth0 11/1/2019 *,,
<br /> Andy A Graves
<br /> B 10/28/2019 JYM FICA,FUTA,SUTA,Workers Comp 7.48 11/1/2019 y
<br /> Andy A Graves
<br /> L 10/29/2019 JYM (5)utility rack conduits 232.25 440 11/1/2019 .β,j)
<br /> supported through roof i
<br /> Andy A Graves ,
<br /> B 10/29/2019 JYM FICA,FUTA,SUTA,Workers Comp 37.37 11/1/2019 (7-723
<br /> '
<br /> Andy A Graves
<br /> L 10/30/2019 JYM Extend 4777 and mount j box 185.80 tAt00 + 11/1/2019
<br /> Andy A Graves
<br /> B 10/30/2019 JYM FICA,FUTA,SUTA,Workers Comp 29.90 11/1/2019
<br /> Andy A Graves
<br /> L 11/1/2019 Set 2nd j box,supports and ty 325.15 11/1/2019
<br /> in(2)47??
<br /> Andy A Graves
<br /> B 11/1/2019 JYM FICA,FUTA,SUTA,Workers Comp 52.32 11/1/2019
<br /> Andy A Graves
<br /> L 11/1/2019 Set 2nd box supports,ty in 238.10 $015011M10, 11/1/2019
<br /> (2)4 inch
<br /> Alex L.Padilla
<br /> B 11/1/2019 80% FICA,FUTA,SUTA,Workers Comp 40.15 11/1/2019
<br /> Alex L.Padilla
<br />
|