My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1610 SE EVERETT MALL WAY 2020-05-18
>
Address Records
>
SE EVERETT MALL WAY
>
1610
>
1610 SE EVERETT MALL WAY 2020-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 1:23:13 PM
Creation date
5/18/2020 11:29:09 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1610
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/15/2019 Page 1 <br /> City of Everett <br /> 12:54:26PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B1306-029 Site Address 1610 SE EVERETT MALL WAY <br /> Applied 6/25/2013 Applicant PONTAK JAMES Lot <br /> Approved 5/13/2015 Owner ANTHEM SELF STORAGE Block <br /> Issued 8/23/2017 Contractor JPR CONSTRUCTION LLC Tract <br /> Parent Permit No. Description NEW 3 STORY SELF STORAGE BLDG-ANTHEM SELF STORA <br /> Notes LANDSCAPE INSPECTION REQUIRED PRIOR TO FINAL INSPECTION <br /> Scheduled Completed Tvoe Inspector Result Remarks Inspector's Comments <br /> 9/26/2016 9/26/2016 Permit Extension TRL APPROVAL 90 DAY <br /> EXTENSION TO <br /> ISSUE <br /> 1/25/2017 12/13/2018 Permit Extension TRL Approval <br /> 4/20/2017 4/20/2017 Permit Extension TKJ Approval 90 DAY <br /> EXTENSION TO <br /> ISSUE <br /> 7/14/2017 7/14/2017 Permit Extension TKJ Approval <br /> 3/16/2018 3/16/2018 FIRE 04-OTHER SAG APPROVAL Flush clean <br /> 3/23/2018 3/23/2018 BLDG DWF OTHER Special insp.by <br /> 01-CONSULTATIO AAR J-B B/C 2-10 <br /> 5/1/2018 5/1/2018 BLDG KMK PARTIAL APPR See notes Wall A/12 from 24-35 and grid line 35 from <br /> 11-INSULATION A7-Al2. <br /> 5/15/2018 5/15/2018 BLDG KMK PARTIAL APPR East side(east half) <br /> 11-INSULATION <br /> 5/31/2018 5/31/2018 BLDG DWF OTHER Pan deck.Inspection <br /> 01-CONSULTATIO by AAR <br /> 6/1/2018 6/1/2018 BLDG KMK PARTIAL APPR North side 1st floor from stait tower 2 to <br /> 11-INSULATION elevator 2 lobby walls only. <br /> 7/3/2018 7/3/2018 BLDG DWF OTHER 2nd pan deck. <br /> 01-CONSULTATIO 55-S.D.3 plans <br /> 45-SD3 <br /> Special inspection AAR <br /> 7/25/2018 7/25/2018 BLDG 13-OTHER DWF OTHER Structural slab <br /> inspection by A.A.R. <br /> 10/9/2018 10/9/2018 BLDG KMK PARTIAL APPR Densglass parapet <br /> 09-DRYWALL walls OK to cover <br /> 10/11/2018 10/11/2018 BLDG KMK PARTIAL APPR East side exterior <br /> 11-INSULATION OK to cover <br /> 10/11/2018 10/11/2018 BLDG KMK APPROVAL As noted Elevaotr 2 <br /> 09-DRYWALL Top of shaft <br /> I hour system complete. <br /> OK to cover. <br /> 10/17/2018 10/17/2018 BLDG DWF APPROVAL Hydro <br /> 11-INSULATION <br /> 10/30/2018 10/30/2018 BLDG KMK PARTIAL APPR Roof insulation in <br /> 11-INSULATION progress <br /> 11/1/2018 11/1/2018 BLDG 13-OTHER KMK APPROVAL Elevator#1 shaft <br /> liner OK to cover <br /> 11/1/2018 11/1/2018 BLDG KMK APPROVAL OK to cover- <br /> 11-INSULATION electrical room <br /> 11/1/2018 11/1/2018 BLDG KMK APPROVAL OK to cover at top of <br /> 08-FRAMING stair wells <br /> 11/21/2018 11/21/2018 BLDG TMB APPROVAL Insulation OK to cover at drive through <br /> 11-INSULATION canopy-south wall. <br /> Electrical room(SW corner)OK nailing on <br /> GWB <br /> OK lid at stair enclosure all 1,2&3 <br /> INSP12 0110VsYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.