Laserfiche WebLink
11/15/2019 City of Everett Page 2 12:54:26PM <br /> INSPECTION ACTIVITY REPORT <br /> 11/21/2018 11/21/2018 BLDG TMB APPROVAL Insulation OK to cover at drive through <br /> 09-DRYWALL canopy-south wall. <br /> Electrical room(SW corner)OK nailing on <br /> GWB <br /> OK lid at stair enclosure all 1,2&3 <br /> 12/14/2018 12/14/2018 BLDG KMK PARTIAL APPR (12/14/2018 3:32 PM KMK) <br /> 11-INSULATION Interior at CMU walls ok to cover <br /> 1/10/2019 1/10/2019 BLDG KMK PARTIAL APPR Contact:425-343-7157 <br /> 11-INSULATION <br /> (1/10/2019 10:49 AM KMK) <br /> South side exterior wall <br /> 1/22/2019 1/22/2019 BLDG DWF PARTIAL APPR (1/22/2019 10:20 AM DWF) <br /> 11-INSULATION West wall only,ok to cover(siding) <br /> 2/4/2019 2/4/2019 BLDG DWF NO ACCESS eTRAKiT Inspection 2/1/2019 4:35 PM Charles Reese <br /> 11-INSULATION Request Please call prior to arrival <br /> Contact Name:Tim Buell <br /> Site Address: 1610 SE EVERETT MALL <br /> WAY <br /> Phone:4254448000 <br /> e-Mail:t.buell.jpr@gmail.com <br /> 2/4/2019 2/4/2019 BLDG DWF NO ACCESS eTRAKiT Inspection 2/1/2019 4:35 PM Charles Reese <br /> 08-FRAMING Request Please call prior to arrival <br /> Contact Name:Tim Buell <br /> Site Address:1610 SE EVERETT MALL <br /> WAY <br /> Phone:4254448000 <br /> e-Mail:t.buell.jpr@gmail.com <br /> 2/6/2019 2/6/2019 BLDG DWF PARTIAL APPR eTRAKiT Inspection 2/5/2019 5:24 AM Charles Reese <br /> 11-INSULATION Request <br /> Contact Name:Tim Buell <br /> Site Address: 1610 SE EVERETT MALL <br /> WAY <br /> Phone:4254448000 <br /> e-Mail:T.Buell.jpr@gmail.com <br /> (2/6/2019 11:28 AM DWF) <br /> Office area and bathrooms 1st floor ok to <br /> cover. <br /> 2/6/2019 2/6/2019 BLDG DWF APPROVAL as noted 2/5/2019 5:24 AM Charles Reese <br /> 08-FRAMING <br /> Contact Name:Tim Buell <br /> Site Address:1610 SE EVERETT MALL <br /> WAY <br /> Phone:4254448000 <br /> e-Mail:T.Buell.jpr@gmail.com <br /> (2/6/2019 11:30 AM DWF) <br /> Need mechanical RI sign off,line set for <br /> mini splits <br /> 3/7/2019 3/7/2019 BLDG DWF PARTIAL APPR eTRAKiT Inspection 3/6/2019 5:51 PM Charles Reese <br /> 09-DRYWALL Request <br /> Contact Name:Tim Buell <br /> Site Address:1610 SE EVERETT MALL <br /> WAY <br /> Phone:4254448000 <br /> e-Mail:t.buell.jpr@gmail.com <br /> (3/7/2019 10:34 AM DWF) <br /> Drywall shaft for mechanical duct;,2+3 <br /> floor,approved as noted and discussed with <br /> Contractor to patch broken Sheetrock on <br /> 3rd floor shaft,then ok to cover <br /> 3/28/2019 3/28/2019 BLDG DWF NOT READY eTRAKiT Inspection Need plans for R value in Ceiling and need <br /> 11-INSULATION Request to be exposed for inspection to verify R <br /> Value as per plans. <br /> INSP12 <br />