P - o-O <br /> Kirk Brooks <br /> From: James Pontak <jpontak@Integralnw.com> <br /> Sent: Wednesday, May 06, 2015 2:09 PM <br /> To: Kirk Brooks <br /> Cc: Latif Lakhani; Kamil Lakhani; Michael E Ryan (michaelr@harmseninc.com) <br /> Subject: EMW Storage Project (Status Memo) <br /> Kirk, <br /> Thank you for your time and assistance this morning. This email is intended to memorialize our discussions today and <br /> outline the current status of the Anthem Self Storage project on Everett Mall Way located at 1610 Everett Mall Way in <br /> Everett Washington. <br /> We met to today, 5.6.2015,to review the pending status of the Anthem Everett Mall Way Self Storage project and <br /> reviewed the project history, design concept, status of pending offsite improvements and design modifications required <br /> by the Washington State Department of Transportation. We presented the design modifications and the associated <br /> effects; provided a before and after comparison of the project attributes and outlined our intentions for construction of <br /> the project. <br /> The specific issues that we addressed are as follows: <br /> 1. Offsite: The offsite improvements required to upgrade and complete the water main Loop on the Northwest <br /> side of Everett Mall Way were completed and signed off on last year. The component of these improvements <br /> that cross Everett Mall Way via and existing casing have not been completed but are permitted for completion <br /> today. The only remaining action is for Anthem Self Storage (EM)to complete this section of the water line. <br /> 2. Storm Water Design modifications: Subsequent to the review and approval received last year,WSDOT made <br /> some additional changes to the design of the outfall routing which ties into the Limited Access line. These <br /> changes were requested to minimize the effects of the improvement on the existing vegetation in this area. We <br /> reviewed the prior design configuration, presented the revised configuration and confirmed the consistent <br /> treatment and dispersion rate prescribed in the previously approved project design. <br /> 3. Upon our satisfactorily addressing your questions,concerns and observations—you signed off on the plan <br /> design modifications as amendments to the previously approved plans and added them the approved plan set <br /> for reference. <br /> 4. Subsequent to our meeting,you verified that we had submitted the property construction cost estimates and <br /> other documentation required to pull the construction permits and contacted me to confirm that everything <br /> was in order for us to pull the construction permit when we're ready. <br /> I hope that this adequately memorializes our interaction today. I invite you to address, augment and/or clarify any <br /> points of interaction that you see differently than outlined above. We greatly appreciate your assistance and look <br /> forward to constructing this project in the near future. <br /> It was a pleasure to meet you and wish you luck in your current endeavors. <br /> Sincerely, <br /> James Pontak <br /> Director of Real Estate &Finance <br /> UINTE RAL <br /> NO$tTHW $Y <br /> 8115 Broadway I Suite 204 I Everett, WA 98203 I vCard <br /> /627 <br />