My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6200 12TH DR SE Geotech Report 2022-10-25
>
Address Records
>
12TH DR SE
>
6200
>
Geotech Report
>
6200 12TH DR SE Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:24:38 PM
Creation date
5/19/2020 9:18:22 AM
Metadata
Fields
Template:
Address Document
Street Name
12TH DR SE
Street Number
6200
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Catholic Housing Services JN 16298 <br /> November 1, 2016 Page 5 <br /> allowable pile load. The appropriate number of load tests would need to be determined at <br /> the time the contractor and installation method are chosen. <br /> As a minimum, Schedule 40 pipe should be used. The site soils are not highly organic, and are not <br /> located near salt water. As a result, they do not have an elevated corrosion potential. Considering <br /> this, it is our opinion that standard "black" pipe can be used, and corrosion protection, such as <br /> galvanizing, is not necessary for the pipe piles. <br /> Pile caps and grade beams should be used to transmit loads to the piles. Isolated pile caps should <br /> include a minimum of two piles to reduce the potential for eccentric loads being applied to the piles. <br /> Subsequent sections of pipe can be connected with slip or threaded couplers, or they can be <br /> welded together. If slip couplers are used, they should fit snugly into the pipe sections. This may <br /> require that shims be used or that beads of welding flux be applied to the outside of the coupler. <br /> Lateral loads due to wind or seismic forces may be resisted by passive earth pressure acting on the <br /> vertical, embedded portions of the foundation. For this condition, the foundation must be either <br /> poured directly against relatively level, undisturbed soil or be surrounded by level compacted fill. <br /> We recommend using a passive earth pressure of 300 pounds per cubic foot (pcf) for this <br /> resistance. If the ground in front of a foundation is loose or sloping, the passive earth pressure <br /> given above will not be appropriate. We recommend a safety factor of at least 1.5 for the <br /> foundation's resistance to lateral loading, when using the above ultimate passive value. <br /> If lateral resistance from fill placed against the foundations is required for this project, the structural <br /> engineer should indicate this requirement on the plans for the general and earthwork contractor's <br /> information. Compacted fill placed against the foundations can consist of on-site soil that is tamped <br /> into place using the backhoe or is compacted using a jumping jack compactor. It is necessary for <br /> the fill to be compacted to a firm condition, but it does not need to reach even 90 percent relative <br /> compaction to develop the passive resistance recommended above. Due to their small diameter, <br /> the lateral capacity of vertical pipe piles is relatively small. However, if lateral resistance in addition <br /> to passive soil resistance is required, we recommend driving battered piles in the same direction as <br /> the applied lateral load. The lateral capacity of a battered pile is equal to one-half of the lateral <br /> component of the allowable compressive load, with a maximum allowable lateral capacity of 1,000 <br /> pounds. The allowable vertical capacity of battered piles does not need to be reduced if the piles <br /> are battered steeper than 1:5 (Horizontal:Vertical). <br /> DRILLED CONCRETE PIERS <br /> Drilled, concrete-filled piers may be used, if it is uneconomical to excavate to bearing soil. Based <br /> on our explorations, it appears that the piers can be constructed by open-hole methods. These <br /> piers should be drilled with conventional auger drills, but the drilling contractor should have access <br /> to casing, in case sloughing occurs in the near-surface soil. If water is in a hole at the time of <br /> pouring, the concrete should be tremied to the bottom of the hole. <br /> A wide variety of depths and pier diameters are possible, but we recommend using a minimum pile <br /> diameter of 16 inches. For a minimum embedment of 5 feet into the very dense soil and a pile <br /> diameter of 16 inches, we recommend assuming an allowable compressive capacity of 30 tons per <br /> pier. Center-to-center pier spacing should be no less than three times the pile diameter. <br /> We recommend reinforcing each pile its entire length. This typically consists of a cage of rebar <br /> extending a portion of the pile's length, with a full-length center bar. For design of the reinforcing, <br /> GEOTECH CONSULTANTS,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.