Laserfiche WebLink
Stannwager ManagementP 2 3 <br /> 1. Preserve V ^._ <br /> -41 BMP C101:Presevving Natural Vegetation <br /> ® BMP C102:Buffer Zones <br /> • BMP C103:High Visibility Plastic or Metal Fence <br /> 2. Establish Construction Access: <br /> f� BMP C105:Stabilized Construction on Entrance/Ext <br /> • BMP C106:Wheel Wash <br /> • BMP 0107:Construction Road/Parking Area Stabilization <br /> 3. Control Flow Rates: <br /> O BMP C203:Water Bars <br /> 1 BMP C240:Sediment Trap <br /> O BMP C241:Temporary Sediment Pond <br /> :**? Not Applicable To My Proposed Project <br /> 4. Instal Sediment Controls: <br /> • BMP C231:Brush Bairkfr <br /> l� BMP C232.Gravel Filter Berm <br /> BMP C233:Sit Fence <br /> ® BMP C234:Vegetated Strip <br /> BMP C235:Watt <br /> 1=9 BMP C240:Sediment Trap <br /> • BMP C241:Temporary Sediment Pond <br /> 5. Stabilize Soils: <br /> • BMP C120:Temporary and Permanent Seeding <br /> • BMP C121: Mulching <br /> �! BMP C122: Nets and Blankets <br /> BMP C123: Plastic Covering <br /> O BMP 0124:Sodding <br /> ® BMP C125:Topsornig/Composing <br /> O BMP C126:Polyacrylamide for Sol Erosion Protecdon <br /> O BMP C130:Surface ming <br /> O BMP C131:Gradient Terraces <br /> BMP C140:Dust Control <br /> 0. Protect Slopes: <br /> -. BMP C120:Temporary and Permanent Sig <br /> ® BMP C130:Surface Roughening <br />