Laserfiche WebLink
• Wegemns Apeetments Rea" May 2,2017 <br /> &ammeter Management 37k) <br /> O BMP C131:Madkrnt Terraces <br /> O BMP C200: Interceptor Me and Swale <br /> o BMP C201:Grass-Lined Channels <br /> o BMP C203:Water Bass <br /> O BMP C204:Pipe Slope Drains <br /> o BMP C205:Subsurface Drains <br /> o BMP C206:Level Spreader <br /> O BMP C207:Check Dams <br /> O BMP C208:Triangular Silt Dike(Geotextile Encased Check Dam) <br /> 7. Protect Drain Inlets: <br /> BMP C220:Storm Drain Inlet Protection <br /> 8. Stabffize Charnels and Outlets: <br /> O B&W C202:Memel Lining <br /> o BMP C 209 Outlet Protection <br /> Not Applicable To My Proposed Project <br /> 9. Control Pollutants: <br /> i BM"C151:Concrete Handling <br /> 1c4i BMP C152:Sawcutting and Surfacing Pollution Prevention <br /> 1111 BMP C153:Material Delivery,Storage,and Containment <br /> O BMP C154:Concrete Washout Area <br /> O BMP C250: Concrete Stormwater Chemical Treatment <br /> o BMP C251:Construction Stonnwater Filtration <br /> O BMP C252: High pH Neutralization Using CO2 <br /> o BMP C253:pH Control for High pH Water <br /> O Not Applicable To My Proposed Project <br /> 10.. Control Dewatering: <br /> O BMP C236:Vegetative Filtration <br /> of Not Applicable To My Proposed Project <br /> 11. Maintain BMPs: <br /> 1: BMP C150:Materials On Hand <br /> r<1 BMP C160:Certified Erosion and Sediment Control Lead(CESCL not reqUied <br /> on-site for sites<laxe) <br /> 12. Managethe Project <br /> BMP C150:Materials On Hand <br />