Laserfiche WebLink
• Wiggems Apattnents Renovation May Z 2017 <br /> Stonnwater Movement •- - 4/2 3 <br /> BMP C160:Certified Erosion and Sediment Control Lead(CESCL not required <br /> on-site for sites<lacre) <br /> • BMP C162:Scheduling <br /> 13. Protect Low Impact Development <br /> o BMP C102:Buffer Zones <br /> O BMP C103:High Visibility Plastic or Metal Fence <br /> O BMP C200: Interceptor Dike and Swale <br /> O BMP C207:Check Dams <br /> o BMP C208:Triangular Silt Dike(Geotextile Encased Check Dam) <br /> o BMP C231:Brush Barrier <br /> o BMP C233:Silt Fence <br /> O BMP C234:Vegetated Strip <br /> ' Not Applicable To My Proposed Project <br /> Minknum Requirement No.3—Source Control of Pollution <br /> Source Control includes both operational and structural BMP's. We have determined that this <br /> project includes activities that are clamed in the City of Everett Stornnvater Management Manual. <br /> The activity codes that are included in this project and the respective Source COMM BREF's that <br /> have been selected to protect steam water are as follows: <br /> Activity Code AS—Construction and Demolition Activities <br /> • BMP A5.2 Bolding Repair, Remodeling, Painting, and Construction is selected for <br /> use. <br /> Activity Code A6—Dust Control and Soil and Sediment Control <br /> • BMP A6.1 Dust Control at Disturbed Land Areas and Unpaved Driving and Parking <br /> Areas is selected for use. <br /> Activity Code A7—Other Activities <br /> • BMP A7.11 Maintenance of Private Ugly Corridors and Fealties is selected for <br /> use. <br /> • BMP A7.12 Maintenance of Stormwater Drainage and Treatment Facilies is <br /> selected for use. <br /> • BMP A7.14 Ehmination of tacit Connections to Storm Drainage System is selected <br /> for use. <br /> Each of the above BMP's that has been selected for use is attached to this letter for quick <br /> reference. <br /> Minknum Requirement No.4—Presetvation of Nature'Drainage Systems and Outfals <br /> The=face water runoff from this project site will not be diverted. The runoff currently flows into a <br /> Combined Sewer system. <br /> Afmknum Requirement No.5—On-sie Stormwater Management <br /> On-site storrmsater management BMP's shall be provided to infiltrate, retain, and disperse <br /> stormwater runoff on-site to the makkrusn extent feasible without causing flooding or erosion <br /> • <br />