Laserfiche WebLink
Projects that convert 3/4 of an acre or more of native vegetation to lawn or <br /> landscape... <br /> • <br /> The total area to be cleared/disturbed for this project is less than % of an acre so this <br /> threshold does not apply. <br /> Projects that through a combination of effective impervious surfaces and converted <br /> pervious surfaces cause a 0.1 cfs increase in the 100-year flow frequency from a <br /> threshold discharge area. <br /> In order to analyze this project three different basins were used and the existing site was <br /> modeled as it is in the current condition as allowed in the definition of Predeveloped <br /> Condition contained on page G-28 in the Glossary. It is clear from my site visit and the <br /> photos provided with this report that the area of the site proposed to be cleared/worked is <br /> landscaped and contains some impervious surfaces. As noted above the existing land <br /> cover today is lawn/landscape with 4,155 sf of existing dispersed impervious surfaces. <br /> The developed site was modeled with the roof area of 3,230 sf on lot 3 along with the <br /> remaining landscaping areas on Lots 1-3. However, the roof areas on lots 1 and 2 and the <br /> pervious pavement areas were not included since they are fully infiltrated and are not <br /> considered effective impervious surfaces. The infiltration system analysis is discussed <br /> below. <br /> Based on the above site assumptions and using the WWHM3 software the existing and <br /> developed surface runoff conditions were calculated. For the existing condition the peak <br /> 100-year flow rate is 0.14 cfs and for the developed condition 0.12 cfs. That is an actual <br /> decrease of 0.02 cfs which is less than the 0.1 cfs increase threshold so this project is <br /> exempt from flow control requirements. Refer to the attached WWMH3 printouts labeled <br /> "Site". <br /> For the sizing the of the infiltration trench needed to serve the roof areas on Lots 1 and 2 a <br /> roof area of 2,440 sf for lot 1 and 1,800 sf for lot 2 was assumed and that is what is shown <br /> on the preliminary plans as well. Therefore, a total of 4,240 sf of roof will be tributary to <br /> the proposed infiltration trench between the two future SFRs. The Geotechnical Engineer <br /> for the project found the soils in this location of the site to be silty sand over fine to medium <br /> sand with trace gravel at a depth ranging from 3-5.5 feet. Refer to test pits 5 & 6. <br /> Therefore, the trench design will require the bottom of the trench to be excavated a <br /> minimum of 6-feet below grade to ensure that the bottom of the trench fullyextends into <br /> the sand layer. The Geotech also provided a recommended long-term infiltration rate of <br /> 1.5"/hr in which he has already applied the necessary factors of safety. This rate was <br /> used in the sizing of the proposed trench. Refer to the attached WWMH3 printouts labeled <br /> "Roof Trench" for the documentation showing the trench as designed (5.5'W, 60'L, 4'D) <br /> will fully infiltrate the roof runoff up to the 100-year storm event. <br /> The pervious pavement section was also analyzed and designed so that the sizing of the <br /> storage rock layer will allow for the full infiltration of the runoff from the private road and <br /> Lot 3 driveway up to the 100-year storm event. This was also done using the WWHM3 <br /> software. The bottom area for the facility is the same as the area of pavement which for <br /> this project is 5,300 sf. It was determined through trial and error that the storage rock <br /> layer needs to be 12-inches thick with a void ratio or 35%. The WWMH3 printout labeled <br /> Thompson Short Plat 11-012 <br /> May 2011 Page 14 <br />