My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4620 SEAHURST AVE 2020-05-20
>
Address Records
>
SEAHURST AVE
>
4620
>
4620 SEAHURST AVE 2020-05-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 2:34:03 PM
Creation date
5/20/2020 2:31:33 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAHURST AVE
Street Number
4620
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. WATER QUALITY DESIGN <br /> Minimum Requirement#6: Runoff Treatment <br /> This project will create more than 5,000 sf of drivable surfaces but the majority of those <br /> surfaces will be pervious pavement which is not considered PGIS. However, based on the <br /> Geotechnical Engineer's findings of the soil beneath the proposed pervious asphalt the <br /> existing soil conditions will provide the necessary treatment of the pavement surface runoff <br /> as part of the infiltration process. This will also apply to the driveway runoff dispersed over <br /> the existing vegetation and amended soils. <br /> 10. WETLAND PROTECTION <br /> Minimum Requirement#8 <br /> No wetlands were found on this site and during the site visit and downstream <br /> analysis/review no wetlands were found in the downstream offsite path as well. <br /> 11. OPERATIONS AND MAINTENANCE MANUAL <br /> The Property Owner Association will be responsible for maintaining the stormwater and <br /> landscaping facilities within this development. Included in this manual are checklists for <br /> each feature specific to this project. Copies should be made of the checklists as <br /> necessary during routine inspections and required maintenance. Specific problems can <br /> be recorded along with the appropriate action taken. <br /> These checklists are a guide for inspections and maintenance. The frequency of the <br /> inspections/maintenance is identified in the left hand column with the following <br /> abbreviations: <br /> A =Annual (March or April preferred) <br /> M = Monthly <br /> S =After Major Storms (Use 1-inch in 24 hours as a guideline) <br /> Routine inspections and maintenance will improve the long-term performance of the <br /> stormwater facilities. If at any time you are unsure if a problem exists or how to address a <br /> specific problem contact a Professional Engineer. <br /> Refer to the following sheets a list of each facility to be maintained and the appropriate <br /> maintenance checklist. <br /> Thompson Short Plat 11-012 <br /> May 2011 Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.