My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3815 SHORE AVE 2020-05-20
>
Address Records
>
SHORE AVE
>
3815
>
3815 SHORE AVE 2020-05-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 3:41:30 PM
Creation date
5/20/2020 3:38:43 PM
Metadata
Fields
Template:
Address Document
Street Name
SHORE AVE
Street Number
3815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f I <br /> R?_)&01g57a) 0.A rv1,e , <br /> • Please include the required notes for storm drainage plans as provided in Section 4-2.7 of the <br /> DCSS somewhere in the drawings.They are as follows: <br /> 4-2.7 REQUIRED NOTES FOR STORM DRAINAGE PLANS <br /> 1. No part of the drainage system shall be covered,concealed,or put into use until it has <br /> been inspected,tested,and accepted by the City of Everett. <br /> 2.All work and material shall conform to the City of Everett Design and Construction <br /> Standards and Specifications and the WSDOT/APWA Standard Specifications for Road, <br /> Bridge, and Municipal Construction (Current Edition). <br /> 3.Approximate locations of existing utilities have been obtained from available records <br /> and are shown for convenience.The contractor shall be responsible for verification of <br /> locations and to avoid damage to any additional utilities shown. If conflicts with existing <br /> utilities arise during construction,the contractor shall notify the Public Works Inspector <br /> and any changes required shall be approved by the City Engineer prior to <br /> commencement of related construction on the project. <br /> 4.All storm systems within the public right-of-way or in easements must be staked by <br /> survey for line and grade prior to starting construction. <br /> 5.All catch basin grates must be stenciled or stamped "Dump No Waste, Drains to <br /> Stream, Lake, River, Puget Sound,or Wetland."Choose appropriate feature for the <br /> project <br />
The URL can be used to link to this page
Your browser does not support the video tag.