Laserfiche WebLink
f I <br /> R?_)&01g57a) 0.A rv1,e , <br /> • Please include the required notes for storm drainage plans as provided in Section 4-2.7 of the <br /> DCSS somewhere in the drawings.They are as follows: <br /> 4-2.7 REQUIRED NOTES FOR STORM DRAINAGE PLANS <br /> 1. No part of the drainage system shall be covered,concealed,or put into use until it has <br /> been inspected,tested,and accepted by the City of Everett. <br /> 2.All work and material shall conform to the City of Everett Design and Construction <br /> Standards and Specifications and the WSDOT/APWA Standard Specifications for Road, <br /> Bridge, and Municipal Construction (Current Edition). <br /> 3.Approximate locations of existing utilities have been obtained from available records <br /> and are shown for convenience.The contractor shall be responsible for verification of <br /> locations and to avoid damage to any additional utilities shown. If conflicts with existing <br /> utilities arise during construction,the contractor shall notify the Public Works Inspector <br /> and any changes required shall be approved by the City Engineer prior to <br /> commencement of related construction on the project. <br /> 4.All storm systems within the public right-of-way or in easements must be staked by <br /> survey for line and grade prior to starting construction. <br /> 5.All catch basin grates must be stenciled or stamped "Dump No Waste, Drains to <br /> Stream, Lake, River, Puget Sound,or Wetland."Choose appropriate feature for the <br /> project <br />