Laserfiche WebLink
ENGINEERING <br />PUBLIC SERVICES DEPARTMENT <br />April 14, 2017 <br />Eric Delfel, PE <br />edelfel@g-o.com <br />Gray & Osborne, Inc. <br />701 Dexter Ave N., STE 200 <br />Seattle, WA 98109 <br />RE: Owner: <br />Job Address: <br />Plan Check Number: <br />Dear Mr. Delfel, <br />Silver Lake Water & Sewer District <br />9911 23rd Ave SE <br />B 1703-043 <br />In response to your application for a construction permit, your plans have been examined and you <br />are advised that revisions may be necessary before a permit can be issued. Please review and <br />respond to the comments below. These comments address building issues only. Additional <br />revisions or additions may be required by other departments (such as Building Architectural, Public <br />Works, Planning, or Fire). All references refer to the 2015 International Building Code (IBC), as <br />amended by the State of Washington and adopted by the City of Everett. <br />In order for the processing of your application to continue, it will be necessary to <br />provide the Building Division with two complete new sets of construction documents <br />reflecting the corrections requested. All revisions require the person delivering the <br />drawings to replace the revisions into the two sets here at our offices. For significant <br />revisions, or if the revisions are coming directly from a document printing facility, <br />please make arrangements with them to print and deliver two replacement sets. <br />Structural <br />/1. On S9 of the structural drawings, it appears that a CMU lintel beam is spanning 12'-0" over <br />a new wall opening. However, the lintel beam reinforcement schedule on S9 indicates no <br />conditions longer than 3'4". Please provide a revised schedule/details and calculations for <br />CMU spanning over wall openings longer than 3'-4". <br />2. Please provide a wall thickness for the HSS 3x3 shown on section B of Sheet S9. <br />3. It is unclear if the retaining walls that form the lower elevation of the pump pit are now <br />designed to be attached to the new slab on grade forming around the pit. If doweling of <br />the new slab to the top existing walls is intended, please verify if the wall is able to resist <br />the "at -rest" soil pressure conditions as opposed to the "active" soil pressure conditions. <br />Please provide a narrative or calculations are required justifying the detailing at the top of <br />the wall. <br />Pagel-aP"� , <br />CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax (425) 257-8857�/ <br />