My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
29 112TH ST SW 2020-05-22
>
Address Records
>
112TH ST SW
>
29
>
29 112TH ST SW 2020-05-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2020 8:48:26 AM
Creation date
5/22/2020 8:47:19 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SW
Street Number
29
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/16/2019 Page 1 <br /> City of Everett <br /> 10:34:33AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1507-017 Site Address 29 112TH ST SE <br /> Applied 7/30/2015 Applicant Lot <br /> Approved Owner ENCORE 41 LLC Block <br /> Issued 8/12/2015 Contractor LANCE HARVEY TRUCKING&EXCAVA Tract <br /> Parent Permit No. RB1502-001 Description NEW SFR-BASIC#RB1502-001 <br /> Notes PLANNING INSPECTION&APPROVAL FOR STREAM BUFFER PLANTING REQUIRED PRIOR <br /> TO BLDG FINAL.CONTACT CITY PLANNER STEVE INGALSBE @ 425-257-7135. <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 8/13/2015 8/13/2015 Footing KMK Maintain set backs, <br /> OK to pour <br /> 8/13/2015 8/13/2015 Foundation KMK Approval Maintain set backs, <br /> OK to pour <br /> 8/21/2015 12/12/2018 PlbgGrWork SDP Unable to <br /> inspect-wanted <br /> underfloor insp <br /> 9/4/2015 9/4/2015 ShearNailing KMK Approval OK to side.(Could <br /> not find permit) <br /> 9/10/2015 9/10/2015 MechRoughln DXW Corr Reqd See notes Heat shield required at exhaust for fire <br /> place,leave loose flashing to see.2 south <br /> top floor bedroom windows not vented,fix <br /> crushed duct in wall for top floor.Plumbing <br /> pipe out of wall by crushed duct,properly <br /> support condensate in attic.R-8 insulation <br /> required on all hard duct in attic. <br /> 9/10/2015 9/10/2015 GasPiping DXW PartialApproval Rough in OK,20 PSI <br /> 9/10/2015 9/10/2015 PlbgRoughln DXW Corr Reqd See notes Test required on plumbing pipe.Complete <br /> plumbing in crawl.Paperwork on white pex <br /> required.Use listed p-trap for tub in crawl. <br /> Relief line to be 6"minimum to 24"off <br /> finished grade. <br /> 9/11/2015 9/11/2015 MechRoughIn DXW Corr Reqd Fix crushed duct <br /> 9/11/2015 9/11/2015 PlbgRoughln DXW Con Reqd See notes Water lines out of wall at upstairs bathroom <br /> at duct. <br /> 9/11/2015 9/11/2015 GasPipeFinal DXW Corr Reqd See notes Fix crushed duct in wall at bathroom-no <br /> exceptions. <br /> What is R-rating for duct liner in hard duct <br /> in attic-must be R-8. <br /> As noted,will look at vented windows at <br /> Final. <br /> 9/14/2015 9/14/2015 MechRoughln DXW Approval See notes Rough in Mechanical OK as noted:two <br /> windows on top floor to be vented at Final <br /> (2 south windows). <br /> 9/14/2015 9/14/2015 PlbgRoughln DXW Approval Rough in Plbg OK <br /> 9/15/2015 9/15/2015 Framing KMK Con Reqd 02/26/2015 1)Complete detail Di/8. Re window <br /> bedroom#4. <br /> 2)Add backing for tub flanges,both <br /> upstairs&downstairs. <br /> 3)Strap cut/drilled top plates-interior <br /> non-bearing walls,when 50%of wood is <br /> missing(both sides). <br /> OK to insulate <br /> 9/17/2015 9/17/2015 InsulBldg KMK Approval OK to rock <br /> 9/21/2015 9/21/2015 DrywallNailing KMK Approval OK to mud&tape <br /> 12/2/2015 12/2/2015 Final Plbg DXW PtAppr-CorrReq See notes Duct test required. <br /> Clean/out drain pan for furnace. <br /> Complete anti-tip for range. <br /> Complete condensate outside with 90 <br /> degree. <br /> INSP12 CRM SYSTEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.